Downloads & Free Reading Options - Results
Presentating A Multi Objective Optimization Model For Resource Constrained Project Scheduling Regarding Financial Costs%2c Time Delays And The Reliability Function
Read "Presentating A Multi Objective Optimization Model For Resource Constrained Project Scheduling Regarding Financial Costs%2c Time Delays And The Reliability Function" through these free online access and download options.
Books Results
Source: The Internet Archive
The internet Archive Search Results
Available books for downloads and borrow from The internet Archive
1Presentating A Multi-objective Optimization Model For Resource-constrained Project Scheduling Regarding Financial Costs, Time Delays And The Reliability Function
The common presuppositions and limitations regarding the Resource Constrained Project Scheduling Problem (RCPSP) were investigated in addition to their reliability in modeling in order to investigate the possibility of availability of renewable resources using a new attitude. The objective of modeling RCPSP was the quantification of total costs and minimization of delays in projects. Hence, in order to mathematically model RCPSP, the first non-linear complex integer math programming was transformed into a linear programming model using the features of exponential functions. To solve the final linear math problem, some experimental examples were designed in different dimensions aiming to study the performance and efficiency of the designed model. For solving low-dimension problems, the exact (epsilon) constraint multi-objective optimization method was used in the Lingo software. A meta-heuristic algorithm called NSGA-II was employed to find solutions for high-dimension problems that the Exact method could not solve. The results of using these algorithms and the statistical analysis (with 95% reliability) indicated that the performance was suitable for the Genetic Algorithm (GA). The calculation error between the Exact method and the meta-heuristic method for the three target categories of total cost, time delay, and reliability was calculated based on the obtained results. The number of errors in calculating the total cost was 26%, 19%, and 5%, respectively. Also, the delay objective function error was equal to 28%, 24%, 12 %, and 14%, respectively. Finally, the reliability objective function error value was equal to 8%, 3%, 29%, and 36%, respectively. Accordingly, it can be concluded that this meta-heuristic algorithm (GA) has more efficiency and more apposite performance for the recommended model compared with the Exact optimization software. The use of the math model designed in this study can result in decreasing the time delays in projects and the costs of scheduling problems, as well as increasing the reliability in multi-mode activities.
“Presentating A Multi-objective Optimization Model For Resource-constrained Project Scheduling Regarding Financial Costs, Time Delays And The Reliability Function” Metadata:
- Title: ➤ Presentating A Multi-objective Optimization Model For Resource-constrained Project Scheduling Regarding Financial Costs, Time Delays And The Reliability Function
- Language: English
“Presentating A Multi-objective Optimization Model For Resource-constrained Project Scheduling Regarding Financial Costs, Time Delays And The Reliability Function” Subjects and Themes:
- Subjects: Project scheduling - Restrained resources - Time delays - Reliability - Multi-mode activities
Edition Identifiers:
- Internet Archive ID: ➤ httpswww.riejournal.comarticle_191915.html
Downloads Information:
The book is available for download in "texts" format, the size of the file-s is: 15.34 Mbs, the file-s for this book were downloaded 7 times, the file-s went public at Sat Jan 11 2025.
Available formats:
Archive BitTorrent - DjVuTXT - Djvu XML - Item Tile - Metadata - OCR Page Index - OCR Search Text - Page Numbers JSON - Scandata - Single Page Processed JP2 ZIP - Text PDF - chOCR - hOCR -
Related Links:
- Whefi.com: Download
- Whefi.com: Review - Coverage
- Internet Archive: Details
- Internet Archive Link: Downloads
Online Marketplaces
Find Presentating A Multi-objective Optimization Model For Resource-constrained Project Scheduling Regarding Financial Costs, Time Delays And The Reliability Function at online marketplaces:
- Amazon: Audiable, Kindle and printed editions.
- Ebay: New & used books.
Buy “Presentating A Multi Objective Optimization Model For Resource Constrained Project Scheduling Regarding Financial Costs%2c Time Delays And The Reliability Function” online:
Shop for “Presentating A Multi Objective Optimization Model For Resource Constrained Project Scheduling Regarding Financial Costs%2c Time Delays And The Reliability Function” on popular online marketplaces.
- Ebay: New and used books.