"Presentating A Multi-objective Optimization Model For Resource-constrained Project Scheduling Regarding Financial Costs, Time Delays And The Reliability Function" - Information and Links:

Presentating A Multi-objective Optimization Model For Resource-constrained Project Scheduling Regarding Financial Costs, Time Delays And The Reliability Function - Info and Reading Options

"Presentating A Multi-objective Optimization Model For Resource-constrained Project Scheduling Regarding Financial Costs, Time Delays And The Reliability Function" and the language of the book is English.


“Presentating A Multi-objective Optimization Model For Resource-constrained Project Scheduling Regarding Financial Costs, Time Delays And The Reliability Function” Metadata:

  • Title: ➤  Presentating A Multi-objective Optimization Model For Resource-constrained Project Scheduling Regarding Financial Costs, Time Delays And The Reliability Function
  • Language: English

“Presentating A Multi-objective Optimization Model For Resource-constrained Project Scheduling Regarding Financial Costs, Time Delays And The Reliability Function” Subjects and Themes:

Edition Identifiers:

  • Internet Archive ID: ➤  httpswww.riejournal.comarticle_191915.html

AI-generated Review of “Presentating A Multi-objective Optimization Model For Resource-constrained Project Scheduling Regarding Financial Costs, Time Delays And The Reliability Function”:


"Presentating A Multi-objective Optimization Model For Resource-constrained Project Scheduling Regarding Financial Costs, Time Delays And The Reliability Function" Description:

The Internet Archive:

<p class="justify_txt ltr" style="margin:0px 0px 10px;line-height:22px;color:rgb(51,51,51);font-family:'ltr-font';font-size:13px;background-color:rgb(255,255,255);">The common presuppositions and limitations regarding the Resource Constrained Project Scheduling Problem (RCPSP) were investigated in addition to their reliability in modeling in order to investigate the possibility of<span style="font-weight:700;"> </span>availability of renewable resources using a new attitude. The objective of modeling RCPSP was the quantification of total costs and minimization of delays in projects. Hence, in order to mathematically model RCPSP, the first non-linear complex integer math programming was transformed into a linear programming model using the features of exponential functions. To solve the final linear math problem, some experimental examples were designed in different dimensions aiming to study the performance and efficiency of the designed model. For solving low-dimension problems, the exact (epsilon) constraint multi-objective optimization method was used in the Lingo software. A meta-heuristic algorithm called NSGA-II was employed to find solutions for high-dimension problems that the Exact method could not solve. The results of using these algorithms and the statistical analysis (with 95% reliability) indicated that the performance was suitable for the Genetic Algorithm (GA). The calculation error between the Exact method and the meta-heuristic method for the three target categories of total cost, time delay, and reliability was calculated based on the obtained results. The number of errors in calculating the total cost was 26%, 19%, and 5%, respectively. Also, the delay objective function error was equal to 28%, 24%, 12 %, and 14%, respectively. Finally, the reliability objective function error value was equal to 8%, 3%, 29%, and 36%, respectively. Accordingly, it can be concluded that this meta-heuristic algorithm (GA) has more efficiency and more apposite performance for the recommended model compared with the Exact optimization software. The use of the math model designed in this study can result in decreasing the time delays in projects and the costs of scheduling problems, as well as increasing the reliability in multi-mode activities.</p>

Read “Presentating A Multi-objective Optimization Model For Resource-constrained Project Scheduling Regarding Financial Costs, Time Delays And The Reliability Function”:

Read “Presentating A Multi-objective Optimization Model For Resource-constrained Project Scheduling Regarding Financial Costs, Time Delays And The Reliability Function” by choosing from the options below.

Available Downloads for “Presentating A Multi-objective Optimization Model For Resource-constrained Project Scheduling Regarding Financial Costs, Time Delays And The Reliability Function”:

"Presentating A Multi-objective Optimization Model For Resource-constrained Project Scheduling Regarding Financial Costs, Time Delays And The Reliability Function" is available for download from The Internet Archive in "texts" format, the size of the file-s is: 15.34 Mbs, and the file-s went public at Sat Jan 11 2025.

Legal and Safety Notes

Copyright Disclaimer and Liability Limitation:

A. Automated Content Display
The creation of this page is fully automated. All data, including text, images, and links, is displayed exactly as received from its original source, without any modification, alteration, or verification. We do not claim ownership of, nor assume any responsibility for, the accuracy or legality of this content.

B. Liability Disclaimer for External Content
The files provided below are solely the responsibility of their respective originators. We disclaim any and all liability, whether direct or indirect, for the content, accuracy, legality, or any other aspect of these files. By using this website, you acknowledge that we have no control over, nor endorse, the content hosted by external sources.

C. Inquiries and Disputes
For any inquiries, concerns, or issues related to the content displayed, including potential copyright claims, please contact the original source or provider of the files directly. We are not responsible for resolving any content-related disputes or claims of intellectual property infringement.

D. No Copyright Ownership
We do not claim ownership of any intellectual property contained in the files or data displayed on this website. All copyrights, trademarks, and other intellectual property rights remain the sole property of their respective owners. If you believe that content displayed on this website infringes upon your intellectual property rights, please contact the original content provider directly.

E. Fair Use Notice
Some content displayed on this website may fall under the "fair use" provisions of copyright law for purposes such as commentary, criticism, news reporting, research, or educational purposes. If you believe any content violates fair use guidelines, please reach out directly to the original source of the content for resolution.

Virus Scanning for Your Peace of Mind:

The files provided below have already been scanned for viruses by their original source. However, if you’d like to double-check before downloading, you can easily scan them yourself using the following steps:

How to scan a direct download link for viruses:

  • 1- Copy the direct link to the file you want to download (don’t open it yet).
  • (a free online tool) and paste the direct link into the provided field to start the scan.
  • 2- Visit VirusTotal (a free online tool) and paste the direct link into the provided field to start the scan.
  • 3- VirusTotal will scan the file using multiple antivirus vendors to detect any potential threats.
  • 4- Once the scan confirms the file is safe, you can proceed to download it with confidence and enjoy your content.

Available Downloads

  • Source: Internet Archive
  • Internet Archive Link: Archive.org page
  • All Files are Available: Yes
  • Number of Files: 15
  • Number of Available Files: 15
  • Added Date: 2025-01-11 15:18:55
  • Scanner: Internet Archive HTML5 Uploader 1.7.0
  • PPI (Pixels Per Inch): 300
  • OCR: tesseract 5.3.0-6-g76ae
  • OCR Detected Language: en

Available Files:

1- Text PDF

  • File origin: original
  • File Format: Text PDF
  • File Size: 0.00 Mbs
  • File Name: 8.pdf
  • Direct Link: Click here

2- Item Tile

  • File origin: original
  • File Format: Item Tile
  • File Size: 0.00 Mbs
  • File Name: __ia_thumb.jpg
  • Direct Link: Click here

3- Metadata

  • File origin: original
  • File Format: Metadata
  • File Size: 0.00 Mbs
  • File Name: httpswww.riejournal.comarticle_191915.html_files.xml
  • Direct Link: Click here

4- Metadata

  • File origin: original
  • File Format: Metadata
  • File Size: 0.00 Mbs
  • File Name: httpswww.riejournal.comarticle_191915.html_meta.sqlite
  • Direct Link: Click here

5- Metadata

  • File origin: original
  • File Format: Metadata
  • File Size: 0.00 Mbs
  • File Name: httpswww.riejournal.comarticle_191915.html_meta.xml
  • Direct Link: Click here

6- chOCR

  • File origin: derivative
  • File Format: chOCR
  • File Size: 0.00 Mbs
  • File Name: 8_chocr.html.gz
  • Direct Link: Click here

7- DjVuTXT

  • File origin: derivative
  • File Format: DjVuTXT
  • File Size: 0.00 Mbs
  • File Name: 8_djvu.txt
  • Direct Link: Click here

8- Djvu XML

  • File origin: derivative
  • File Format: Djvu XML
  • File Size: 0.00 Mbs
  • File Name: 8_djvu.xml
  • Direct Link: Click here

9- hOCR

  • File origin: derivative
  • File Format: hOCR
  • File Size: 0.00 Mbs
  • File Name: 8_hocr.html
  • Direct Link: Click here

10- OCR Page Index

  • File origin: derivative
  • File Format: OCR Page Index
  • File Size: 0.00 Mbs
  • File Name: 8_hocr_pageindex.json.gz
  • Direct Link: Click here

11- OCR Search Text

  • File origin: derivative
  • File Format: OCR Search Text
  • File Size: 0.00 Mbs
  • File Name: 8_hocr_searchtext.txt.gz
  • Direct Link: Click here

12- Single Page Processed JP2 ZIP

  • File origin: derivative
  • File Format: Single Page Processed JP2 ZIP
  • File Size: 0.01 Mbs
  • File Name: 8_jp2.zip
  • Direct Link: Click here

13- Page Numbers JSON

  • File origin: derivative
  • File Format: Page Numbers JSON
  • File Size: 0.00 Mbs
  • File Name: 8_page_numbers.json
  • Direct Link: Click here

14- Scandata

  • File origin: derivative
  • File Format: Scandata
  • File Size: 0.00 Mbs
  • File Name: 8_scandata.xml
  • Direct Link: Click here

15- Archive BitTorrent

  • File origin: metadata
  • File Format: Archive BitTorrent
  • File Size: 0.00 Mbs
  • File Name: httpswww.riejournal.comarticle_191915.html_archive.torrent
  • Direct Link: Click here

Search for “Presentating A Multi-objective Optimization Model For Resource-constrained Project Scheduling Regarding Financial Costs, Time Delays And The Reliability Function” downloads:

Visit our Downloads Search page to see if downloads are available.

Find “Presentating A Multi-objective Optimization Model For Resource-constrained Project Scheduling Regarding Financial Costs, Time Delays And The Reliability Function” in Libraries Near You:

Read or borrow “Presentating A Multi-objective Optimization Model For Resource-constrained Project Scheduling Regarding Financial Costs, Time Delays And The Reliability Function” from your local library.

Buy “Presentating A Multi-objective Optimization Model For Resource-constrained Project Scheduling Regarding Financial Costs, Time Delays And The Reliability Function” online:

Shop for “Presentating A Multi-objective Optimization Model For Resource-constrained Project Scheduling Regarding Financial Costs, Time Delays And The Reliability Function” on popular online marketplaces.