Scoping determination, Boston crossing: submission requirements for draft project impact report (dpir). - Info and Reading Options
By Boston Redevelopment Authority

"Scoping determination, Boston crossing: submission requirements for draft project impact report (dpir)." was published in 1989 - mau, it has 42 pages and the language of the book is English.
“Scoping determination, Boston crossing: submission requirements for draft project impact report (dpir).” Metadata:
- Title: ➤ Scoping determination, Boston crossing: submission requirements for draft project impact report (dpir).
- Author: Boston Redevelopment Authority
- Language: English
- Number of Pages: 42
- Publish Date: 1989
- Publish Location: mau
“Scoping determination, Boston crossing: submission requirements for draft project impact report (dpir).” Subjects and Themes:
- Subjects: ➤ Office buildings - Cultural Facilities - Proposed - Parking garages - Development Projects - Proposals - Downtown - Boston Crossing, Boston (Mass.) - Midtown Cultural District, Boston (Mass.) - Pedestrians - Winds - Retail Space - Environmental impact analysis
Edition Specifications:
- Pagination: ➤ 42 p. + attchments; maps, photos
Edition Identifiers:
- The Open Library ID: OL23331573M - OL7064417W
AI-generated Review of “Scoping determination, Boston crossing: submission requirements for draft project impact report (dpir).”:
"Scoping determination, Boston crossing: submission requirements for draft project impact report (dpir)." Description:
The Open Library:
...contains information concerning Campeau Massachusetts, Inc.'s proposed development project located at Chauncy, Washington and Summer Streets and Hayward Place in the midtown cultural district of downtown Boston presently occupied by Jordan Marsh, Lafayette Place, the Lafayette Hotel and an underground parking garage; describes the proposal to construct 3 new office buildings, new and redeveloped retail space, below-grade parking and loading facilities and cultural and neighborhood facilities; summarizes the Midtown Cultural District Plan; sets forth submission requirements and elements that the company must address in the environmental impact statement, as well as what financial information is required; also includes pedestrian safety/comfort wind standards, a copy of "Construction Management Program", etc.; a copy of this item was in the BRA collection...
Read “Scoping determination, Boston crossing: submission requirements for draft project impact report (dpir).”:
Read “Scoping determination, Boston crossing: submission requirements for draft project impact report (dpir).” by choosing from the options below.
Search for “Scoping determination, Boston crossing: submission requirements for draft project impact report (dpir).” downloads:
Visit our Downloads Search page to see if downloads are available.
Borrow "Scoping determination, Boston crossing: submission requirements for draft project impact report (dpir)." Online:
Check on the availability of online borrowing. Please note that online borrowing has copyright-based limitations and that the quality of ebooks may vary.
- Is Online Borrowing Available: Yes
- Preview Status: full
- Check if available: The Open Library & The Internet Archive
Find “Scoping determination, Boston crossing: submission requirements for draft project impact report (dpir).” in Libraries Near You:
Read or borrow “Scoping determination, Boston crossing: submission requirements for draft project impact report (dpir).” from your local library.
Buy “Scoping determination, Boston crossing: submission requirements for draft project impact report (dpir).” online:
Shop for “Scoping determination, Boston crossing: submission requirements for draft project impact report (dpir).” on popular online marketplaces.
- Ebay: New and used books.