"Formulas and Calculations for Drilling, Production, and Workover" - Information and Links:

Formulas and Calculations for Drilling, Production, and Workover

All the Formulas You Need to Solve Drilling and Production Problems

"Formulas and Calculations for Drilling, Production, and Workover" is published by Elsevier Science & Technology Books in 2022 - San Diego, it has 450 pages and the language of the book is English.


“Formulas and Calculations for Drilling, Production, and Workover” Metadata:

  • Title: ➤  Formulas and Calculations for Drilling, Production, and Workover
  • Author:
  • Language: English
  • Number of Pages: 450
  • Publisher: ➤  Elsevier Science & Technology Books
  • Publish Date:
  • Publish Location: San Diego

“Formulas and Calculations for Drilling, Production, and Workover” Subjects and Themes:

Edition Identifiers:

AI-generated Review of “Formulas and Calculations for Drilling, Production, and Workover”:


"Formulas and Calculations for Drilling, Production, and Workover" Description:

Open Data:

Intro -- Formulas and Calculations for Drilling, Production, and Workover: All the Formulas You Need to Solve Drilling and Producti ... -- Copyright -- Contents -- Preface -- Prologue -- Chapter 1: Basic equations -- 1.1. Terminology -- 1.2. Mud weight MW (lb/ft3), mud weight MW (ppg), and specific gravity (SG) -- 1.3. Hydrostatic pressure (P) and (p) -- 1.4. Pressure gradient (psi/ft), G (ppg) -- 1.5. Mud pump output q (bbl/stk) and Q (gpm) -- 1.5.1. Triplex pump -- 1.5.2. Duplex pump -- 1.6. Hydraulic horsepower -- 1.7. Estimated weight of drill collars in AIR -- 1.8. Open hole and tubular capacity and displacement formulas -- 1.8.1. Capacity of open hole or tubulars -- 1.8.2. Displacement of tubulars -- 1.8.3. Annular capacity between casing or hole and drill pipe, tubing, or casing -- 1.8.4. Annular capacity between casing and multiple strings of tubing -- 1.9. Amount of cuttings drilled per foot of hole -- 1.10. Annular velocity (AV) -- 1.11. Pump output required in GPM for a desired annular velocity, ft/min -- 1.12. Bottoms-up formula -- 1.13. Pump pressure/pump stroke relationship (the Roughnecks formula) -- 1.14. Buoyancy factor (BF) -- 1.15. Formation temperature (Tf) -- 1.16. Temperature conversion formulas -- Appendix: Supplementary material -- Chapter 2: RIG calculations -- 2.1. Accumulator capacity -- 2.1.1. Usable volume per bottle -- 2.1.2. Surface application -- 2.1.3. Volume capacity of the accumulator bottle -- 2.1.4. Deepwater applications -- 2.1.5. Accumulator precharge pressure -- 2.2. Slug calculations -- 2.2.1. Barrels of slug required for a desired length of dry pipe -- 2.2.2. Weight of slug required for a desired length of dry pipe with a set volume of slug -- 2.2.3. Volume, height, and pressure gained because of placement of the slug in the drill pipe -- 2.2.4. The amount of dry pipe in feet after pumping the slug

Read “Formulas and Calculations for Drilling, Production, and Workover”:

Read “Formulas and Calculations for Drilling, Production, and Workover” by choosing from the options below.

Search for “Formulas and Calculations for Drilling, Production, and Workover” downloads:

Visit our Downloads Search page to see if downloads are available.

Find “Formulas and Calculations for Drilling, Production, and Workover” in Libraries Near You:

Read or borrow “Formulas and Calculations for Drilling, Production, and Workover” from your local library.

Buy “Formulas and Calculations for Drilling, Production, and Workover” online:

Shop for “Formulas and Calculations for Drilling, Production, and Workover” on popular online marketplaces.