Downloads and Free Reading Options

Project Management by Jack R. Meredith

Read "Project Management" by Jack R. Meredith through these free online access and download options.

Search for Downloads

Search by Title or Author

Books Results

Source: The Internet Archive

The internet Archive Search Results

Available books for downloads and borrow from The internet Archive

1Software Project Management Styles And Project Size Impacts On Employee Stress Levels.

By

IT projects are known for their overruns. Since creating a piece of software can vary a lot more than e.g building construction it is much harder to estimate the time of development at the start of a project. This means that IT projects commonly run overtime and go over budget. These overruns could possibly be a large source of stress for the employees working in these IT projects. Little is known about the stress levels during development in IT projects and how this is affected by different variables such as the working method or size of the given project. Thus we want to conduct an experiment to investigate this. ref1: https://ieeexplore.ieee.org/abstract/document/6480418?casa_token=ozOSKXbaFfYAAAAA:5oblaTNbVA32xuZ7Kr4N8lcpkSy4nXe2x9pDxOeGJ_2S8KE19JJpcyo7LX44ty1yrbb-SUDsDw ref2: https://www.sciencedirect.com/science/article/pii/S0263786302000984?casa_token=h9qZxygD8PYAAAAA:Qu5VVARgLpa0Cd_qkSzX3kvBNclbJN9OPfbcTxGLyr5D_vSl_JflRRrW9iKWNfXZemX8FLb9

“Software Project Management Styles And Project Size Impacts On Employee Stress Levels.” Metadata:

  • Title: ➤  Software Project Management Styles And Project Size Impacts On Employee Stress Levels.
  • Authors:

Edition Identifiers:

Downloads Information:

The book is available for download in "data" format, the size of the file-s is: 0.09 Mbs, the file-s for this book were downloaded 1 times, the file-s went public at Thu Aug 26 2021.

Available formats:
Archive BitTorrent - Metadata - ZIP -

Related Links:

Online Marketplaces

Find Software Project Management Styles And Project Size Impacts On Employee Stress Levels. at online marketplaces:


2DTIC ADA209220: Mosquito Information Management Project (MIMP): Application Of A Computerized General Purpose Information Management System (SELGEM) To Medically Important Arthropods (Diptera: Culicidae)

By

This project was established in October 1979, to develop a computer- based systematic and ecological computer file (data bank) for the approximately one million mosquito specimens in the National Museum of Natural History collection. This collection is the largest and most complete mosquito collection in the world and represents a national treasure. The data management system, SELGEM (SElf-GEnerating Master), was selected as the primary storage/management system. Data recorded on collection forms are submitted to a Honeywell Series 60 Level 66/80 computer via a Nixdorf 600/55 minicomputer.

“DTIC ADA209220: Mosquito Information Management Project (MIMP): Application Of A Computerized General Purpose Information Management System (SELGEM) To Medically Important Arthropods (Diptera: Culicidae)” Metadata:

  • Title: ➤  DTIC ADA209220: Mosquito Information Management Project (MIMP): Application Of A Computerized General Purpose Information Management System (SELGEM) To Medically Important Arthropods (Diptera: Culicidae)
  • Author: ➤  
  • Language: English

“DTIC ADA209220: Mosquito Information Management Project (MIMP): Application Of A Computerized General Purpose Information Management System (SELGEM) To Medically Important Arthropods (Diptera: Culicidae)” Subjects and Themes:

Edition Identifiers:

Downloads Information:

The book is available for download in "texts" format, the size of the file-s is: 3.42 Mbs, the file-s for this book were downloaded 36 times, the file-s went public at Thu Feb 22 2018.

Available formats:
Abbyy GZ - Archive BitTorrent - DjVuTXT - Djvu XML - Item Tile - Metadata - OCR Page Index - OCR Search Text - Page Numbers JSON - Scandata - Single Page Processed JP2 ZIP - Text PDF - chOCR - hOCR -

Related Links:

Online Marketplaces

Find DTIC ADA209220: Mosquito Information Management Project (MIMP): Application Of A Computerized General Purpose Information Management System (SELGEM) To Medically Important Arthropods (Diptera: Culicidae) at online marketplaces:


3ERIC ED433828: Library Digitisation Project Management.

By

Supervision of library digitization is the focus of this paper. First outlined are the definition, formalization, implementation, and completion phases of project management. Descriptions of management decisions involved in digitization projects follow on matters such as: collection analysis, resourcing, project personnel, production, access and metainformation, and intellectual property. These procedures to be formalized and implemented in digitization projects are then highlighted: selection for digital conversion, plan approach, produce digital collection and access aid, store in digital archive, create framework, assemble digital collection, test and refine, and release. Projects in Australian public, academic, and special libraries are then noted. The paper provides the following pointers for libraries embarking upon digitisation programs: policy framework, training, standards, application, and monitoring. (Contains 16 references.) (AEF)

“ERIC ED433828: Library Digitisation Project Management.” Metadata:

  • Title: ➤  ERIC ED433828: Library Digitisation Project Management.
  • Author:
  • Language: English

“ERIC ED433828: Library Digitisation Project Management.” Subjects and Themes:

Edition Identifiers:

Downloads Information:

The book is available for download in "texts" format, the size of the file-s is: 10.51 Mbs, the file-s for this book were downloaded 71 times, the file-s went public at Wed Dec 30 2015.

Available formats:
Abbyy GZ - Animated GIF - Archive BitTorrent - DjVu - DjVuTXT - Djvu XML - Item Tile - Metadata - Scandata - Single Page Processed JP2 ZIP - Text PDF -

Related Links:

Online Marketplaces

Find ERIC ED433828: Library Digitisation Project Management. at online marketplaces:


4NASA Technical Reports Server (NTRS) 20110023163: Amine Swingbed Payload Project Management

By

The International Space Station (ISS) has been designed as a laboratory for demonstrating technologies in a microgravity environment, benefitting exploration programs by reducing the overall risk of implementing such technologies in new spacecraft. At the beginning of fiscal year 2010, the ISS program manager requested that the amine-based, pressure-swing carbon dioxide and humidity absorption technology (designed by Hamilton Sundstrand, baselined for the ORION Multi-Purpose Crew Vehicle, and tested at the Johnson Space Center in relevant environments, including with humans, since 2005) be developed into a payload for ISS Utilization. In addition to evaluating the amine technology in a flight environment before the first launch of the ORION vehicle, the ISS program wanted to determine the capability of the amine technology to remove carbon dioxide from the ISS cabin environment at the metabolic rate of the full 6-person crew. Because the amine technology vents the absorbed carbon dioxide and water vapor to space vacuum (open loop), additional hardware needed to be developed to minimize the amount of air and water resources lost overboard. Additionally, the payload system would be launched on two separate Space Shuttle flights, with the heart of the payload the swingbed unit itself launching a full year before the remainder of the payload. This paper discusses the project management and challenges of developing the amine swingbed payload in order to accomplish the technology objectives of both the open-loop ORION application as well as the closed-loop ISS application.

“NASA Technical Reports Server (NTRS) 20110023163: Amine Swingbed Payload Project Management” Metadata:

  • Title: ➤  NASA Technical Reports Server (NTRS) 20110023163: Amine Swingbed Payload Project Management
  • Author: ➤  
  • Language: English

“NASA Technical Reports Server (NTRS) 20110023163: Amine Swingbed Payload Project Management” Subjects and Themes:

Edition Identifiers:

Downloads Information:

The book is available for download in "texts" format, the size of the file-s is: 0.47 Mbs, the file-s for this book were downloaded 57 times, the file-s went public at Mon Nov 07 2016.

Available formats:
Abbyy GZ - Animated GIF - Archive BitTorrent - DjVuTXT - Djvu XML - Item Tile - Metadata - Scandata - Single Page Processed JP2 ZIP - Text PDF -

Related Links:

Online Marketplaces

Find NASA Technical Reports Server (NTRS) 20110023163: Amine Swingbed Payload Project Management at online marketplaces:


5Project Management

By

The International Space Station (ISS) has been designed as a laboratory for demonstrating technologies in a microgravity environment, benefitting exploration programs by reducing the overall risk of implementing such technologies in new spacecraft. At the beginning of fiscal year 2010, the ISS program manager requested that the amine-based, pressure-swing carbon dioxide and humidity absorption technology (designed by Hamilton Sundstrand, baselined for the ORION Multi-Purpose Crew Vehicle, and tested at the Johnson Space Center in relevant environments, including with humans, since 2005) be developed into a payload for ISS Utilization. In addition to evaluating the amine technology in a flight environment before the first launch of the ORION vehicle, the ISS program wanted to determine the capability of the amine technology to remove carbon dioxide from the ISS cabin environment at the metabolic rate of the full 6-person crew. Because the amine technology vents the absorbed carbon dioxide and water vapor to space vacuum (open loop), additional hardware needed to be developed to minimize the amount of air and water resources lost overboard. Additionally, the payload system would be launched on two separate Space Shuttle flights, with the heart of the payload the swingbed unit itself launching a full year before the remainder of the payload. This paper discusses the project management and challenges of developing the amine swingbed payload in order to accomplish the technology objectives of both the open-loop ORION application as well as the closed-loop ISS application.

“Project Management” Metadata:

  • Title: Project Management
  • Authors:

Edition Identifiers:

Downloads Information:

The book is available for download in "data" format, the size of the file-s is: 0.20 Mbs, the file-s for this book were downloaded 2 times, the file-s went public at Fri Sep 03 2021.

Available formats:
Archive BitTorrent - Metadata - ZIP -

Related Links:

Online Marketplaces

Find Project Management at online marketplaces:


6DTIC ADA311381: U.S. Coast Guard Telecommunications Project Management Using The Structured Approach Model.

By

The U.S. Coast Guard has been continuously asked to perform more missions with less resources. Technological advances in telecommunications and information systems accessibility have played a major role in the Coast Guard meeting these challenges. However, to meet new demands for even greater efficiency and effectiveness, the Coast Guard strategy for tighter interoperability between Coast Guard commands must continue to evolve. To support this evolution, the Command, Control, and Communication Branch of the Coast Guard must use a strategy for project management that will foster greater efficiency and effectiveness. This strategy should include a standardized approach to project management that fosters communication, attention to detail, and leads to interoperability of systems through standardization without extensively limiting creativity or use of technological advances. This paper demonstrates how the use of systems thinking, and in particular the Structured Approach Model, can encourage the management characteristics that will lead to the development of more effective telecommunications projects and completion of those projects in a more efficient manner. This paper explains the seven phases of the Structured Approach Model and views each using the functional, organizational, and physical prospectives. Steps for applying the model are given and are aimed at the Coast Guard project officer.

“DTIC ADA311381: U.S. Coast Guard Telecommunications Project Management Using The Structured Approach Model.” Metadata:

  • Title: ➤  DTIC ADA311381: U.S. Coast Guard Telecommunications Project Management Using The Structured Approach Model.
  • Author: ➤  
  • Language: English

“DTIC ADA311381: U.S. Coast Guard Telecommunications Project Management Using The Structured Approach Model.” Subjects and Themes:

Edition Identifiers:

Downloads Information:

The book is available for download in "texts" format, the size of the file-s is: 199.18 Mbs, the file-s for this book were downloaded 49 times, the file-s went public at Sun Apr 01 2018.

Available formats:
Abbyy GZ - Additional Text PDF - Archive BitTorrent - DjVuTXT - Djvu XML - Image Container PDF - Item Tile - Metadata - OCR Page Index - OCR Search Text - Page Numbers JSON - Scandata - Single Page Processed JP2 ZIP - chOCR - hOCR -

Related Links:

Online Marketplaces

Find DTIC ADA311381: U.S. Coast Guard Telecommunications Project Management Using The Structured Approach Model. at online marketplaces:


7DTIC ADA393600: Ambrough Slough Habitat Rehabilitation And Enhancement Project. Upper Mississippi River System, Environmental Management Program, Definite Project Report/Environmental Assessment (SP-23). Pool 10, Upper Mississippi River, Crawford County, Wisconsin

By

The Ambrough Slough complex is a 1200-hectare area containing a number of backwater lakes, sloughs and other wetland habitats in pool 10 of the Upper Mississippi River near Prairie du Chien, Wisconsin. The habitat concerns within the Ambrough Slough complex are primarily related to providing adequate habitat for backwater fish, especially over wintering habitat. Backwater dredging is recommended for Spring Lake, Big Missouri Lake and Upper Doubles Lake to increase water depths and improve summer and winter fish habitat. The largest lake in the complex, Gremore Lake, suffers dissolved oxygen depletion in the winter, which would be alleviated by constructing a small channel to introduce flows from Ambrough Slough into Gremore Lake. Reducing flows at Black Slough, Upper Double Lake and Tilmont Lake would improve winter habitat conditions by reducing current velocities and maintaining water temperatures within tolerance ranges of backwater fish.

“DTIC ADA393600: Ambrough Slough Habitat Rehabilitation And Enhancement Project. Upper Mississippi River System, Environmental Management Program, Definite Project Report/Environmental Assessment (SP-23). Pool 10, Upper Mississippi River, Crawford County, Wisconsin” Metadata:

  • Title: ➤  DTIC ADA393600: Ambrough Slough Habitat Rehabilitation And Enhancement Project. Upper Mississippi River System, Environmental Management Program, Definite Project Report/Environmental Assessment (SP-23). Pool 10, Upper Mississippi River, Crawford County, Wisconsin
  • Author: ➤  
  • Language: English

“DTIC ADA393600: Ambrough Slough Habitat Rehabilitation And Enhancement Project. Upper Mississippi River System, Environmental Management Program, Definite Project Report/Environmental Assessment (SP-23). Pool 10, Upper Mississippi River, Crawford County, Wisconsin” Subjects and Themes:

Edition Identifiers:

Downloads Information:

The book is available for download in "texts" format, the size of the file-s is: 579.37 Mbs, the file-s for this book were downloaded 58 times, the file-s went public at Fri May 04 2018.

Available formats:
Abbyy GZ - Additional Text PDF - Archive BitTorrent - DjVuTXT - Djvu XML - Image Container PDF - JPEG Thumb - Metadata - OCR Page Index - OCR Search Text - Page Numbers JSON - Scandata - Single Page Processed JP2 ZIP - chOCR - hOCR -

Related Links:

Online Marketplaces

Find DTIC ADA393600: Ambrough Slough Habitat Rehabilitation And Enhancement Project. Upper Mississippi River System, Environmental Management Program, Definite Project Report/Environmental Assessment (SP-23). Pool 10, Upper Mississippi River, Crawford County, Wisconsin at online marketplaces:


8The Use Of Transactional Analysis In Project Management Organizations.

By

The Ambrough Slough complex is a 1200-hectare area containing a number of backwater lakes, sloughs and other wetland habitats in pool 10 of the Upper Mississippi River near Prairie du Chien, Wisconsin. The habitat concerns within the Ambrough Slough complex are primarily related to providing adequate habitat for backwater fish, especially over wintering habitat. Backwater dredging is recommended for Spring Lake, Big Missouri Lake and Upper Doubles Lake to increase water depths and improve summer and winter fish habitat. The largest lake in the complex, Gremore Lake, suffers dissolved oxygen depletion in the winter, which would be alleviated by constructing a small channel to introduce flows from Ambrough Slough into Gremore Lake. Reducing flows at Black Slough, Upper Double Lake and Tilmont Lake would improve winter habitat conditions by reducing current velocities and maintaining water temperatures within tolerance ranges of backwater fish.

“The Use Of Transactional Analysis In Project Management Organizations.” Metadata:

  • Title: ➤  The Use Of Transactional Analysis In Project Management Organizations.
  • Author:
  • Language: English

Edition Identifiers:

Downloads Information:

The book is available for download in "texts" format, the size of the file-s is: 52.08 Mbs, the file-s for this book were downloaded 52 times, the file-s went public at Sat Jan 30 2021.

Available formats:
Archive BitTorrent - DjVuTXT - Djvu XML - EPUB - Item Tile - Metadata - OCR Page Index - OCR Search Text - Page Numbers JSON - Scandata - Single Page Processed JP2 ZIP - Text PDF - chOCR - hOCR -

Related Links:

Online Marketplaces

Find The Use Of Transactional Analysis In Project Management Organizations. at online marketplaces:


9Lecture 6 Project Resource Management Voice Record

Lecture 6 

“Lecture 6 Project Resource Management Voice Record” Metadata:

  • Title: ➤  Lecture 6 Project Resource Management Voice Record

Edition Identifiers:

Downloads Information:

The book is available for download in "data" format, the size of the file-s is: 115.71 Mbs, the file-s for this book were downloaded 15 times, the file-s went public at Sat Feb 10 2024.

Available formats:
Archive BitTorrent - Metadata - RAR -

Related Links:

Online Marketplaces

Find Lecture 6 Project Resource Management Voice Record at online marketplaces:


10NASA Project Management

By

No Abstract Available

“NASA Project Management” Metadata:

  • Title: NASA Project Management
  • Author:
  • Language: English

“NASA Project Management” Subjects and Themes:

Edition Identifiers:

Downloads Information:

The book is available for download in "texts" format, the size of the file-s is: 0.58 Mbs, the file-s for this book were downloaded 246 times, the file-s went public at Sun Aug 01 2010.

Available formats:
Abbyy GZ - Animated GIF - Archive BitTorrent - DjVu - DjVuTXT - Djvu XML - Item Tile - Metadata - Scandata - Single Page Processed JP2 ZIP - Text PDF -

Related Links:

Online Marketplaces

Find NASA Project Management at online marketplaces:


11NASA Technical Reports Server (NTRS) 20140003192: Management Of The Atmosphere Resource Recovery And Environmental Monitoring Project

By

The Advanced Exploration Systems Program's Atmosphere Resource Recovery and Environmental Monitoring (ARREM) project is working to further optimize atmosphere revitalization and environmental monitoring system architectures. This paper discusses project management strategies that tap into skill sets across multiple engineering disciplines, projects, field centers, and industry to achieve the project success. It is the project's objective to contribute to system advances that will enable sustained exploration missions beyond Lower Earth Orbit (LEO) and improve affordability by focusing on the primary goals of achieving high reliability, improving efficiency, and reducing dependence on ground-based logistics resupply. Technology demonstrations are achieved by infusing new technologies and concepts with existing developmental hardware and operating in a controlled environment simulating various crewed habitat scenarios. The ARREM project's strengths include access to a vast array of existing developmental hardware that perform all the vital atmosphere revitalization functions, exceptional test facilities to fully evaluate system performance, and a well-coordinated partnering effort among the NASA field centers and industry partners to provide the innovative expertise necessary to succeed.

“NASA Technical Reports Server (NTRS) 20140003192: Management Of The Atmosphere Resource Recovery And Environmental Monitoring Project” Metadata:

  • Title: ➤  NASA Technical Reports Server (NTRS) 20140003192: Management Of The Atmosphere Resource Recovery And Environmental Monitoring Project
  • Author: ➤  
  • Language: English

“NASA Technical Reports Server (NTRS) 20140003192: Management Of The Atmosphere Resource Recovery And Environmental Monitoring Project” Subjects and Themes:

Edition Identifiers:

Downloads Information:

The book is available for download in "texts" format, the size of the file-s is: 0.45 Mbs, the file-s for this book were downloaded 69 times, the file-s went public at Mon Nov 14 2016.

Available formats:
Abbyy GZ - Animated GIF - Archive BitTorrent - DjVuTXT - Djvu XML - Item Tile - Metadata - Scandata - Single Page Processed JP2 ZIP - Text PDF -

Related Links:

Online Marketplaces

Find NASA Technical Reports Server (NTRS) 20140003192: Management Of The Atmosphere Resource Recovery And Environmental Monitoring Project at online marketplaces:


12DTIC ADA458064: Stochastic Expert Choice In Ship Production Project Management

By

Shipbuilders have traditionally delayed major change decisions until the last moment and often not until it was too late to solve a problem. The reason was largely risk aversiveness of shipyard management, an unfortunate attitude in an industry subject to large uncertainties and risks. Expert choice, or the analytic hierarchical process (AHP), offers an approach which allows consideration of all the factors, as well as the risk attitudes of the decision makers and others involved. The basic AHP method was modified to permit consideration of the probabilities associated with hierarchical relationships of factors and decision makers. AHP is further suggested to include the effect of time on the determination of the risk, and time dependence of the outcome of alternative decisions. Thereby AHP permits determination of not only the most effective choices, but also timing of complex decisions met so frequently in ship production project management.

“DTIC ADA458064: Stochastic Expert Choice In Ship Production Project Management” Metadata:

  • Title: ➤  DTIC ADA458064: Stochastic Expert Choice In Ship Production Project Management
  • Author: ➤  
  • Language: English

“DTIC ADA458064: Stochastic Expert Choice In Ship Production Project Management” Subjects and Themes:

Edition Identifiers:

Downloads Information:

The book is available for download in "texts" format, the size of the file-s is: 6.06 Mbs, the file-s for this book were downloaded 66 times, the file-s went public at Thu Jun 07 2018.

Available formats:
Abbyy GZ - Archive BitTorrent - DjVuTXT - Djvu XML - JPEG Thumb - Metadata - OCR Page Index - OCR Search Text - Page Numbers JSON - Scandata - Single Page Processed JP2 ZIP - Text PDF - chOCR - hOCR -

Related Links:

Online Marketplaces

Find DTIC ADA458064: Stochastic Expert Choice In Ship Production Project Management at online marketplaces:


13DTIC ADA197840: Analysis And Implementation Of The Logistics Equipment Directorate's Project Management System

By

Comprehensive milestone schedules have been developed for selected programs using Harvard Total Project Manager (HTPM) software to guide them through the materiel acquisition process. Using the data from these schedules loaded into the R:Base System V Database Management System, project engineers and directorate management personnel use microcomputers to effectively manage their programs. The report provides a description of a Project Management System (PMS) and the results of an extensive analysis of that system.

“DTIC ADA197840: Analysis And Implementation Of The Logistics Equipment Directorate's Project Management System” Metadata:

  • Title: ➤  DTIC ADA197840: Analysis And Implementation Of The Logistics Equipment Directorate's Project Management System
  • Author: ➤  
  • Language: English

“DTIC ADA197840: Analysis And Implementation Of The Logistics Equipment Directorate's Project Management System” Subjects and Themes:

Edition Identifiers:

Downloads Information:

The book is available for download in "texts" format, the size of the file-s is: 46.74 Mbs, the file-s for this book were downloaded 54 times, the file-s went public at Mon Feb 19 2018.

Available formats:
Abbyy GZ - Archive BitTorrent - DjVuTXT - Djvu XML - Item Tile - Metadata - OCR Page Index - OCR Search Text - Page Numbers JSON - Scandata - Single Page Processed JP2 ZIP - Text PDF - chOCR - hOCR -

Related Links:

Online Marketplaces

Find DTIC ADA197840: Analysis And Implementation Of The Logistics Equipment Directorate's Project Management System at online marketplaces:


14First Me, Then We: A Student Handbook To Successful Project Management And Managerial Communication

By

Comprehensive milestone schedules have been developed for selected programs using Harvard Total Project Manager (HTPM) software to guide them through the materiel acquisition process. Using the data from these schedules loaded into the R:Base System V Database Management System, project engineers and directorate management personnel use microcomputers to effectively manage their programs. The report provides a description of a Project Management System (PMS) and the results of an extensive analysis of that system.

“First Me, Then We: A Student Handbook To Successful Project Management And Managerial Communication” Metadata:

  • Title: ➤  First Me, Then We: A Student Handbook To Successful Project Management And Managerial Communication
  • Author:
  • Language: English

Edition Identifiers:

Downloads Information:

The book is available for download in "texts" format, the size of the file-s is: 141.75 Mbs, the file-s for this book were downloaded 5 times, the file-s went public at Wed Sep 27 2023.

Available formats:
ACS Encrypted PDF - Cloth Cover Detection Log - DjVuTXT - Djvu XML - Item Tile - JPEG Thumb - LCP Encrypted EPUB - LCP Encrypted PDF - Log - Metadata - OCR Page Index - OCR Search Text - PNG - Page Numbers JSON - RePublisher Final Processing Log - RePublisher Initial Processing Log - Scandata - Single Page Original JP2 Tar - Single Page Processed JP2 ZIP - Text PDF - Title Page Detection Log - chOCR - hOCR -

Related Links:

Online Marketplaces

Find First Me, Then We: A Student Handbook To Successful Project Management And Managerial Communication at online marketplaces:


15Conflict Management Pattern In Cross-functional Project Teams

By

This is a qualitative research of the behavioral pattern of cross-functional project teams when they are in conflict situations. This study aims to explore this with a combination of interviewed, case and archival materials.

“Conflict Management Pattern In Cross-functional Project Teams” Metadata:

  • Title: ➤  Conflict Management Pattern In Cross-functional Project Teams
  • Authors:

Edition Identifiers:

Downloads Information:

The book is available for download in "data" format, the size of the file-s is: 0.08 Mbs, the file-s went public at Fri Mar 14 2025.

Available formats:
Archive BitTorrent - Metadata - ZIP -

Related Links:

Online Marketplaces

Find Conflict Management Pattern In Cross-functional Project Teams at online marketplaces:


16CIA Reading Room Cia-rdp78-03097a000500040053-7: COMPLETION REPORT ON MANAGEMENT PROJECT BY O & M SERVICE, PROJECT NO. 3-6.

By

2, Continue al a 4tea or a 1t1 _ r s >o scuaa the refit to deta., Fat b, It t Such as for the past 9m Ph 2 of aub. ct repi 7pproved For Release 20 at Pro3eat . 0 & M r * 2# Thl5 Di1 received the r es t of mn-mv dAt?ed 25 e # reco il, It bdtev d following .. --ta are submii rem; iz by 11fted, t ft but tioz izork In one ^k week hrve been A study of touard the Approved For Release 2006/03/10 : CIA-RDP78-03q t y that the 1 .1t Iftexisten". it a fait. 00 The action wimtod In para. h of , e t has trem a p1ish ie Uy n~ the peen c; ?..1;1 eft the fival 0 1 mrVey of the - ? paf1 tx?iW bets 97A000500040053-7 IMOV Iscus- pi-.V Approved For Release 2006/03/10 : CIA-RDP78-03097A000500040053-7

“CIA Reading Room Cia-rdp78-03097a000500040053-7: COMPLETION REPORT ON MANAGEMENT PROJECT BY O & M SERVICE, PROJECT NO. 3-6.” Metadata:

  • Title: ➤  CIA Reading Room Cia-rdp78-03097a000500040053-7: COMPLETION REPORT ON MANAGEMENT PROJECT BY O & M SERVICE, PROJECT NO. 3-6.
  • Author:
  • Language: English

Edition Identifiers:

Downloads Information:

The book is available for download in "texts" format, the size of the file-s is: 1.94 Mbs, the file-s for this book were downloaded 4 times, the file-s went public at Sat Sep 14 2024.

Available formats:
Additional Text PDF - Archive BitTorrent - DjVuTXT - Djvu XML - Image Container PDF - Item Tile - Metadata - OCR Page Index - OCR Search Text - Page Numbers JSON - Scandata - Single Page Processed JP2 ZIP - chOCR - hOCR -

Related Links:

Online Marketplaces

Find CIA Reading Room Cia-rdp78-03097a000500040053-7: COMPLETION REPORT ON MANAGEMENT PROJECT BY O & M SERVICE, PROJECT NO. 3-6. at online marketplaces:


17Complex IT Project Management : 16 Steps To Success

By

2, Continue al a 4tea or a 1t1 _ r s >o scuaa the refit to deta., Fat b, It t Such as for the past 9m Ph 2 of aub. ct repi 7pproved For Release 20 at Pro3eat . 0 & M r * 2# Thl5 Di1 received the r es t of mn-mv dAt?ed 25 e # reco il, It bdtev d following .. --ta are submii rem; iz by 11fted, t ft but tioz izork In one ^k week hrve been A study of touard the Approved For Release 2006/03/10 : CIA-RDP78-03q t y that the 1 .1t Iftexisten". it a fait. 00 The action wimtod In para. h of , e t has trem a p1ish ie Uy n~ the peen c; ?..1;1 eft the fival 0 1 mrVey of the - ? paf1 tx?iW bets 97A000500040053-7 IMOV Iscus- pi-.V Approved For Release 2006/03/10 : CIA-RDP78-03097A000500040053-7

“Complex IT Project Management : 16 Steps To Success” Metadata:

  • Title: ➤  Complex IT Project Management : 16 Steps To Success
  • Author:
  • Language: English

“Complex IT Project Management : 16 Steps To Success” Subjects and Themes:

Edition Identifiers:

Downloads Information:

The book is available for download in "texts" format, the size of the file-s is: 787.16 Mbs, the file-s for this book were downloaded 27 times, the file-s went public at Tue Dec 13 2022.

Available formats:
ACS Encrypted PDF - Cloth Cover Detection Log - DjVuTXT - Djvu XML - Dublin Core - Item Tile - JPEG Thumb - JSON - LCP Encrypted EPUB - LCP Encrypted PDF - Log - MARC - MARC Binary - Metadata - Metadata Log - OCR Page Index - OCR Search Text - PNG - Page Numbers JSON - RePublisher Final Processing Log - RePublisher Initial Processing Log - Scandata - Single Page Original JP2 Tar - Single Page Processed JP2 ZIP - Text PDF - Title Page Detection Log - chOCR - hOCR -

Related Links:

Online Marketplaces

Find Complex IT Project Management : 16 Steps To Success at online marketplaces:


18Computer Project Management

By

2, Continue al a 4tea or a 1t1 _ r s >o scuaa the refit to deta., Fat b, It t Such as for the past 9m Ph 2 of aub. ct repi 7pproved For Release 20 at Pro3eat . 0 & M r * 2# Thl5 Di1 received the r es t of mn-mv dAt?ed 25 e # reco il, It bdtev d following .. --ta are submii rem; iz by 11fted, t ft but tioz izork In one ^k week hrve been A study of touard the Approved For Release 2006/03/10 : CIA-RDP78-03q t y that the 1 .1t Iftexisten". it a fait. 00 The action wimtod In para. h of , e t has trem a p1ish ie Uy n~ the peen c; ?..1;1 eft the fival 0 1 mrVey of the - ? paf1 tx?iW bets 97A000500040053-7 IMOV Iscus- pi-.V Approved For Release 2006/03/10 : CIA-RDP78-03097A000500040053-7

“Computer Project Management” Metadata:

  • Title: Computer Project Management
  • Author:
  • Language: English

Edition Identifiers:

Downloads Information:

The book is available for download in "texts" format, the size of the file-s is: 309.21 Mbs, the file-s for this book were downloaded 9 times, the file-s went public at Wed Feb 22 2023.

Available formats:
ACS Encrypted PDF - Cloth Cover Detection Log - DjVuTXT - Djvu XML - Item Tile - JPEG Thumb - JSON - LCP Encrypted EPUB - LCP Encrypted PDF - Log - Metadata - Metadata Log - OCR Page Index - OCR Search Text - PNG - Page Numbers JSON - RePublisher Final Processing Log - RePublisher Initial Processing Log - Scandata - Single Page Original JP2 Tar - Single Page Processed JP2 ZIP - Text PDF - Title Page Detection Log - chOCR - hOCR -

Related Links:

Online Marketplaces

Find Computer Project Management at online marketplaces:


19Statewide Airport System Plan Project Management Team Meating 8/11/09

By

The Aeronautics Division established a Project Management Team (PMT) to serve in an advisory role by providing input and comment during the project in order to help ensure the MSASP effectively addresses the key issues facing the statewide airport system. Meeting up to six times throughout the planning process, the PMT membership represents a cross section of the Massachusetts community of aviation stakeholders, including various state and federal government officials, airport and business representatives, airport users, and other interested agencies from across the state. The PMT plays a critical role in this planning effort in that members are responsible to act as conduits to the airports, agencies, and other constituencies that they represent.

“Statewide Airport System Plan Project Management Team Meating 8/11/09” Metadata:

  • Title: ➤  Statewide Airport System Plan Project Management Team Meating 8/11/09
  • Author: ➤  
  • Language: English

“Statewide Airport System Plan Project Management Team Meating 8/11/09” Subjects and Themes:

Edition Identifiers:

Downloads Information:

The book is available for download in "texts" format, the size of the file-s is: 5.63 Mbs, the file-s for this book were downloaded 30 times, the file-s went public at Sun Aug 01 2021.

Available formats:
Archive BitTorrent - DjVuTXT - Djvu XML - Item Tile - Metadata - OCR Page Index - OCR Search Text - Page Numbers JSON - Scandata - Single Page Processed JP2 ZIP - Text PDF - chOCR - hOCR -

Related Links:

Online Marketplaces

Find Statewide Airport System Plan Project Management Team Meating 8/11/09 at online marketplaces:


20DTIC ADA217210: Archaeological Reconnaissance For Historic Properties Within The Peoria Lake Environmental Management Program, Habitat Rehabilitation Enhancement Project, Woodford County Conservation Area, Chillicothe, Illinois. Phase 1

By

Approximately 190 acres of land within the floodplain of the Illinois River in extreme northwestern Woodford County, Illinois, were the subject of a Phase I archaeological and geomorphological investigation. No significant historic properties were identified, and it is recommended that the proposed Peoria Lake Environmental Management Program, Habitat Rehabilitation Enhancement Project, proceed without further historic properties evaluation.

“DTIC ADA217210: Archaeological Reconnaissance For Historic Properties Within The Peoria Lake Environmental Management Program, Habitat Rehabilitation Enhancement Project, Woodford County Conservation Area, Chillicothe, Illinois. Phase 1” Metadata:

  • Title: ➤  DTIC ADA217210: Archaeological Reconnaissance For Historic Properties Within The Peoria Lake Environmental Management Program, Habitat Rehabilitation Enhancement Project, Woodford County Conservation Area, Chillicothe, Illinois. Phase 1
  • Author: ➤  
  • Language: English

“DTIC ADA217210: Archaeological Reconnaissance For Historic Properties Within The Peoria Lake Environmental Management Program, Habitat Rehabilitation Enhancement Project, Woodford County Conservation Area, Chillicothe, Illinois. Phase 1” Subjects and Themes:

Edition Identifiers:

Downloads Information:

The book is available for download in "texts" format, the size of the file-s is: 24.06 Mbs, the file-s for this book were downloaded 93 times, the file-s went public at Sat Feb 24 2018.

Available formats:
Abbyy GZ - Archive BitTorrent - DjVuTXT - Djvu XML - Item Tile - Metadata - OCR Page Index - OCR Search Text - Page Numbers JSON - Scandata - Single Page Processed JP2 ZIP - Text PDF - chOCR - hOCR -

Related Links:

Online Marketplaces

Find DTIC ADA217210: Archaeological Reconnaissance For Historic Properties Within The Peoria Lake Environmental Management Program, Habitat Rehabilitation Enhancement Project, Woodford County Conservation Area, Chillicothe, Illinois. Phase 1 at online marketplaces:


21Code Of Practice For Project Management For Construction And Development

Approximately 190 acres of land within the floodplain of the Illinois River in extreme northwestern Woodford County, Illinois, were the subject of a Phase I archaeological and geomorphological investigation. No significant historic properties were identified, and it is recommended that the proposed Peoria Lake Environmental Management Program, Habitat Rehabilitation Enhancement Project, proceed without further historic properties evaluation.

“Code Of Practice For Project Management For Construction And Development” Metadata:

  • Title: ➤  Code Of Practice For Project Management For Construction And Development
  • Language: English

“Code Of Practice For Project Management For Construction And Development” Subjects and Themes:

Edition Identifiers:

Downloads Information:

The book is available for download in "texts" format, the size of the file-s is: 409.05 Mbs, the file-s for this book were downloaded 55 times, the file-s went public at Mon Jun 15 2020.

Available formats:
ACS Encrypted EPUB - ACS Encrypted PDF - Abbyy GZ - Cloth Cover Detection Log - DjVuTXT - Djvu XML - Dublin Core - Item Tile - JPEG Thumb - JSON - LCP Encrypted EPUB - LCP Encrypted PDF - Log - MARC - MARC Binary - Metadata - OCR Page Index - OCR Search Text - PNG - Page Numbers JSON - Scandata - Single Page Original JP2 Tar - Single Page Processed JP2 ZIP - Text PDF - Title Page Detection Log - chOCR - hOCR -

Related Links:

Online Marketplaces

Find Code Of Practice For Project Management For Construction And Development at online marketplaces:


227Y4K-KEZL: Legal Project Management: Projectifying The Legal…

Perma.cc archive of https://lthj.qut.edu.au/article/view/1610 created on 2022-03-02 21:11:11.773752+00:00.

“7Y4K-KEZL: Legal Project Management: Projectifying The Legal…” Metadata:

  • Title: ➤  7Y4K-KEZL: Legal Project Management: Projectifying The Legal…

Edition Identifiers:

Downloads Information:

The book is available for download in "web" format, the size of the file-s is: 2.93 Mbs, the file-s for this book were downloaded 48 times, the file-s went public at Thu Mar 03 2022.

Available formats:
Archive BitTorrent - Item CDX Index - Item CDX Meta-Index - Metadata - WARC CDX Index - Web ARChive GZ -

Related Links:

Online Marketplaces

Find 7Y4K-KEZL: Legal Project Management: Projectifying The Legal… at online marketplaces:


23Draft Environmental Impact Statement For The Green Mountain Mining Venture, Jackpot Mine Project, Fremont And Sweetwater Counties, Wyoming : Prepared For Lander Resource Area Rawlins District Bureau Of Land Management, Rawlins, Wyoming

Perma.cc archive of https://lthj.qut.edu.au/article/view/1610 created on 2022-03-02 21:11:11.773752+00:00.

“Draft Environmental Impact Statement For The Green Mountain Mining Venture, Jackpot Mine Project, Fremont And Sweetwater Counties, Wyoming : Prepared For Lander Resource Area Rawlins District Bureau Of Land Management, Rawlins, Wyoming” Metadata:

  • Title: ➤  Draft Environmental Impact Statement For The Green Mountain Mining Venture, Jackpot Mine Project, Fremont And Sweetwater Counties, Wyoming : Prepared For Lander Resource Area Rawlins District Bureau Of Land Management, Rawlins, Wyoming
  • Language: ENG

Edition Identifiers:

Downloads Information:

The book is available for download in "texts" format, the size of the file-s is: 476.14 Mbs, the file-s for this book were downloaded 504 times, the file-s went public at Wed Mar 27 2013.

Available formats:
Abbyy GZ - Animated GIF - Archive BitTorrent - Cloth Cover Detection Log - DjVu - DjVuTXT - Djvu XML - Generic Raw Book Zip - JPEG Thumb - MARC Source - Metadata - OCR Page Index - OCR Search Text - Page Numbers JSON - Scandata - Single Page Processed JP2 ZIP - Text PDF - chOCR - hOCR -

Related Links:

Online Marketplaces

Find Draft Environmental Impact Statement For The Green Mountain Mining Venture, Jackpot Mine Project, Fremont And Sweetwater Counties, Wyoming : Prepared For Lander Resource Area Rawlins District Bureau Of Land Management, Rawlins, Wyoming at online marketplaces:


24DTIC ADA240104: Monterey Peninsula Water Supply Project Supplemental Draft Environmental Impact Report/Statement. Volume 2. Monterey Peninsula Water Management District

By

The Monterey Peninsula Water Management District in California has examined 10 alternatives with the goal of providing a municipal water supply to the Monterey Peninsula that would provide adequate drought protection for existing residents and meet the long-term water supply needs of planned growth. This EIR/EIS examines the environmental consequences of the 10 project alternatives, including four reservoir sizes at two dam sites on the main stem of the Carmel River, three dam sites on tributaries to the Carmel River, one off-stream reservoir, desalination, and the No project alternative. Partial contents include vegetation, wildlife, environmental impact of reservoir and desalination plants, climate and air quality, Noise pollution, History and archaeology, Public health and safety, Land use, planning and recreation, Socioeconomics and population, employment and housing estimates, traffic, air quality, solid waste, waste water and Fiscal Impacts.

“DTIC ADA240104: Monterey Peninsula Water Supply Project Supplemental Draft Environmental Impact Report/Statement. Volume 2. Monterey Peninsula Water Management District” Metadata:

  • Title: ➤  DTIC ADA240104: Monterey Peninsula Water Supply Project Supplemental Draft Environmental Impact Report/Statement. Volume 2. Monterey Peninsula Water Management District
  • Author: ➤  
  • Language: English

“DTIC ADA240104: Monterey Peninsula Water Supply Project Supplemental Draft Environmental Impact Report/Statement. Volume 2. Monterey Peninsula Water Management District” Subjects and Themes:

Edition Identifiers:

Downloads Information:

The book is available for download in "texts" format, the size of the file-s is: 197.81 Mbs, the file-s for this book were downloaded 49 times, the file-s went public at Sat Mar 03 2018.

Available formats:
Abbyy GZ - Archive BitTorrent - DjVuTXT - Djvu XML - Item Tile - Metadata - OCR Page Index - OCR Search Text - Page Numbers JSON - Scandata - Single Page Processed JP2 ZIP - Text PDF - chOCR - hOCR -

Related Links:

Online Marketplaces

Find DTIC ADA240104: Monterey Peninsula Water Supply Project Supplemental Draft Environmental Impact Report/Statement. Volume 2. Monterey Peninsula Water Management District at online marketplaces:


25Advanced Project Management

By

The Monterey Peninsula Water Management District in California has examined 10 alternatives with the goal of providing a municipal water supply to the Monterey Peninsula that would provide adequate drought protection for existing residents and meet the long-term water supply needs of planned growth. This EIR/EIS examines the environmental consequences of the 10 project alternatives, including four reservoir sizes at two dam sites on the main stem of the Carmel River, three dam sites on tributaries to the Carmel River, one off-stream reservoir, desalination, and the No project alternative. Partial contents include vegetation, wildlife, environmental impact of reservoir and desalination plants, climate and air quality, Noise pollution, History and archaeology, Public health and safety, Land use, planning and recreation, Socioeconomics and population, employment and housing estimates, traffic, air quality, solid waste, waste water and Fiscal Impacts.

“Advanced Project Management” Metadata:

  • Title: Advanced Project Management
  • Author:
  • Language: English

“Advanced Project Management” Subjects and Themes:

Edition Identifiers:

Downloads Information:

The book is available for download in "texts" format, the size of the file-s is: 816.14 Mbs, the file-s for this book were downloaded 62 times, the file-s went public at Sat Jun 27 2020.

Available formats:
ACS Encrypted EPUB - ACS Encrypted PDF - Abbyy GZ - Cloth Cover Detection Log - DjVuTXT - Djvu XML - Dublin Core - Item Tile - JPEG Thumb - JSON - LCP Encrypted EPUB - LCP Encrypted PDF - Log - MARC - MARC Binary - Metadata - OCR Page Index - OCR Search Text - PNG - Page Numbers JSON - Scandata - Single Page Original JP2 Tar - Single Page Processed JP2 ZIP - Text PDF - Title Page Detection Log - chOCR - hOCR -

Related Links:

Online Marketplaces

Find Advanced Project Management at online marketplaces:


26Adaptive Management For Water Resources Project Planning

The Monterey Peninsula Water Management District in California has examined 10 alternatives with the goal of providing a municipal water supply to the Monterey Peninsula that would provide adequate drought protection for existing residents and meet the long-term water supply needs of planned growth. This EIR/EIS examines the environmental consequences of the 10 project alternatives, including four reservoir sizes at two dam sites on the main stem of the Carmel River, three dam sites on tributaries to the Carmel River, one off-stream reservoir, desalination, and the No project alternative. Partial contents include vegetation, wildlife, environmental impact of reservoir and desalination plants, climate and air quality, Noise pollution, History and archaeology, Public health and safety, Land use, planning and recreation, Socioeconomics and population, employment and housing estimates, traffic, air quality, solid waste, waste water and Fiscal Impacts.

“Adaptive Management For Water Resources Project Planning” Metadata:

  • Title: ➤  Adaptive Management For Water Resources Project Planning
  • Language: English

“Adaptive Management For Water Resources Project Planning” Subjects and Themes:

Edition Identifiers:

Downloads Information:

The book is available for download in "texts" format, the size of the file-s is: 421.58 Mbs, the file-s for this book were downloaded 32 times, the file-s went public at Sun Aug 07 2022.

Available formats:
ACS Encrypted PDF - AVIF Thumbnails ZIP - Cloth Cover Detection Log - DjVuTXT - Djvu XML - Dublin Core - Item Tile - JPEG Thumb - JSON - LCP Encrypted EPUB - LCP Encrypted PDF - Log - MARC - MARC Binary - Metadata - OCR Page Index - OCR Search Text - PNG - Page Numbers JSON - RePublisher Final Processing Log - RePublisher Initial Processing Log - Scandata - Single Page Original JP2 Tar - Single Page Processed JP2 ZIP - Text PDF - Title Page Detection Log - chOCR - hOCR -

Related Links:

Online Marketplaces

Find Adaptive Management For Water Resources Project Planning at online marketplaces:


27ERIC ED498631: Putting The Q Into Quality Project Management

By

Project management covers a wide range of skills and is one of the best forms of staff development available for the development of skills by doing. This publication is for the use of staff involved in e-learning development projects. An introduction and overview includes discussion of e-learning projects in general and why they are undertaken; duties of the project manager and characteristics of a good manager; project cost estimates; selecting a team and formalizing partnerships; accountability; and initial meetings. Project start-up activities are discussed, including making the business case; planning; risk management; contract management and setting measurable performance criteria. Managing individual project aspects, such as progress, change, stakeholder expectations and satisfaction are discussed, followed by project closure; post-implementation review and measuring/disseminating success. Project tips are included for specific areas such as questions to ask in advance; declining a project; and getting back on track. A section on staff development is also included. This report contains a glossary, bibliography, and online resources. An appendix, Mapping this Publication to the ePD Framework and PRINCE 2 Methodology, is included. [This publication was jointly funded by the Centre for Excellence in Leadership (CEL) and the Learning and Skills Network (LSN).]

“ERIC ED498631: Putting The Q Into Quality Project Management” Metadata:

  • Title: ➤  ERIC ED498631: Putting The Q Into Quality Project Management
  • Author:
  • Language: English

“ERIC ED498631: Putting The Q Into Quality Project Management” Subjects and Themes:

Edition Identifiers:

Downloads Information:

The book is available for download in "texts" format, the size of the file-s is: 33.26 Mbs, the file-s for this book were downloaded 154 times, the file-s went public at Tue Jan 26 2016.

Available formats:
Abbyy GZ - Animated GIF - Archive BitTorrent - DjVu - DjVuTXT - Djvu XML - Item Tile - Metadata - Scandata - Single Page Processed JP2 ZIP - Text PDF -

Related Links:

Online Marketplaces

Find ERIC ED498631: Putting The Q Into Quality Project Management at online marketplaces:


28Painless Project Management With FogBugz

By

Includes index

“Painless Project Management With FogBugz” Metadata:

  • Title: ➤  Painless Project Management With FogBugz
  • Author:
  • Language: English

Edition Identifiers:

Downloads Information:

The book is available for download in "texts" format, the size of the file-s is: 252.96 Mbs, the file-s for this book were downloaded 61 times, the file-s went public at Fri Jul 29 2011.

Available formats:
ACS Encrypted PDF - Abbyy GZ - Animated GIF - Cloth Cover Detection Log - DjVuTXT - Djvu XML - Dublin Core - Item Tile - JSON - LCP Encrypted EPUB - LCP Encrypted PDF - MARC - MARC Binary - MARC Source - Metadata - Metadata Log - OCLC xISBN JSON - OCR Page Index - OCR Search Text - Page Numbers JSON - Scandata - Single Page Original JP2 Tar - Single Page Processed JP2 ZIP - Text PDF - chOCR - hOCR -

Related Links:

Online Marketplaces

Find Painless Project Management With FogBugz at online marketplaces:


291 Introduction To Project Management V 4

1 Introduction To Project Management V 4

“1 Introduction To Project Management V 4” Metadata:

  • Title: ➤  1 Introduction To Project Management V 4
  • Language: English

Edition Identifiers:

Downloads Information:

The book is available for download in "texts" format, the size of the file-s is: 5.19 Mbs, the file-s for this book were downloaded 134 times, the file-s went public at Sat Jun 15 2013.

Available formats:
Archive BitTorrent - Metadata - RAR -

Related Links:

Online Marketplaces

Find 1 Introduction To Project Management V 4 at online marketplaces:


30Engineering Project Management

1 Introduction To Project Management V 4

“Engineering Project Management” Metadata:

  • Title: Engineering Project Management
  • Language: English

“Engineering Project Management” Subjects and Themes:

Edition Identifiers:

Downloads Information:

The book is available for download in "texts" format, the size of the file-s is: 1092.49 Mbs, the file-s for this book were downloaded 25 times, the file-s went public at Wed Sep 21 2022.

Available formats:
ACS Encrypted PDF - AVIF Thumbnails ZIP - Cloth Cover Detection Log - DjVuTXT - Djvu XML - Dublin Core - Item Tile - JPEG Thumb - JSON - LCP Encrypted EPUB - LCP Encrypted PDF - Log - MARC - MARC Binary - Metadata - OCR Page Index - OCR Search Text - PNG - Page Numbers JSON - RePublisher Final Processing Log - RePublisher Initial Processing Log - Scandata - Single Page Original JP2 Tar - Single Page Processed JP2 ZIP - Text PDF - Title Page Detection Log - chOCR - hOCR -

Related Links:

Online Marketplaces

Find Engineering Project Management at online marketplaces:


31Management Audit Of The District's Almaden Campus Solar Project : Final Report.

By

The Temporary District Auditor has completed his management audit of the Santa Clara Valley Water District's Almaden Campus Solar Project. The purpose of this audit is to examine the costs and benefits of this project. This examination included a review of project documents, materials submitted to the Board, financial records and interviews with key staff. This examination was recommended by the District's Audit Ad Hoc Committee as part of the Board's pilot audit program. The Temporary District Auditor was directed to complete this examination by the Board of Directors in November 2009. The following report contains a summary of findings, followed by sections that provide an overview of the project and a summary of project costs. The report also includes 2 recommendations. The first recommendation is for the Board to codify budgetary controls it has implemented since the start of Fiscal Year 2007, but are not contained in its Governance Policies. The second recommendation calls for periodic review of the District's energy portfolio and evaluation of potential alternative energy projects. Because the factors driving cost and benefit of these projects [are] subject to rapid change, periodic review and consideration of projects will help to ensure that the District's management of its power costs is cost effective and environmentally responsible."

“Management Audit Of The District's Almaden Campus Solar Project : Final Report.” Metadata:

  • Title: ➤  Management Audit Of The District's Almaden Campus Solar Project : Final Report.
  • Author: ➤  
  • Language: English

“Management Audit Of The District's Almaden Campus Solar Project : Final Report.” Subjects and Themes:

Edition Identifiers:

Downloads Information:

The book is available for download in "texts" format, the size of the file-s is: 6.08 Mbs, the file-s for this book were downloaded 79 times, the file-s went public at Mon May 14 2018.

Available formats:
Abbyy GZ - Archive BitTorrent - DjVuTXT - Djvu XML - Item Tile - Metadata - Scandata - Single Page Processed JP2 ZIP - Text PDF -

Related Links:

Online Marketplaces

Find Management Audit Of The District's Almaden Campus Solar Project : Final Report. at online marketplaces:


32NASA Technical Reports Server (NTRS) 19940023424: ADP Analysis Project For The Human Resources Management Division

By

The ADP (Automated Data Processing) Analysis Project was conducted for the Human Resources Management Division (HRMD) of NASA's Langley Research Center. The three major areas of work in the project were computer support, automated inventory analysis, and an ADP study for the Division. The goal of the computer support work was to determine automation needs of Division personnel and help them solve computing problems. The goal of automated inventory analysis was to find a way to analyze installed software and usage on a Macintosh. Finally, the ADP functional systems study for the Division was designed to assess future HRMD needs concerning ADP organization and activities.

“NASA Technical Reports Server (NTRS) 19940023424: ADP Analysis Project For The Human Resources Management Division” Metadata:

  • Title: ➤  NASA Technical Reports Server (NTRS) 19940023424: ADP Analysis Project For The Human Resources Management Division
  • Author: ➤  
  • Language: English

“NASA Technical Reports Server (NTRS) 19940023424: ADP Analysis Project For The Human Resources Management Division” Subjects and Themes:

Edition Identifiers:

Downloads Information:

The book is available for download in "texts" format, the size of the file-s is: 3.39 Mbs, the file-s for this book were downloaded 73 times, the file-s went public at Mon Oct 03 2016.

Available formats:
Abbyy GZ - Animated GIF - Archive BitTorrent - DjVuTXT - Djvu XML - Item Tile - Metadata - Scandata - Single Page Processed JP2 ZIP - Text PDF -

Related Links:

Online Marketplaces

Find NASA Technical Reports Server (NTRS) 19940023424: ADP Analysis Project For The Human Resources Management Division at online marketplaces:


33XG4F-XUKT: The 2021 Project Management Report

Perma.cc archive of https://rebelsguidetopm.com/project-management-statistics/ created on 2022-02-16 03:05:47.321495+00:00.

“XG4F-XUKT: The 2021 Project Management Report” Metadata:

  • Title: ➤  XG4F-XUKT: The 2021 Project Management Report

Edition Identifiers:

Downloads Information:

The book is available for download in "web" format, the size of the file-s is: 2.44 Mbs, the file-s for this book were downloaded 1648 times, the file-s went public at Thu Feb 17 2022.

Available formats:
Archive BitTorrent - Item CDX Index - Item CDX Meta-Index - Metadata - WARC CDX Index - Web ARChive GZ -

Related Links:

Online Marketplaces

Find XG4F-XUKT: The 2021 Project Management Report at online marketplaces:


3410 Project Communication Management V 4

project management

“10 Project Communication Management V 4” Metadata:

  • Title: ➤  10 Project Communication Management V 4
  • Language: English

Edition Identifiers:

Downloads Information:

The book is available for download in "texts" format, the size of the file-s is: 0.76 Mbs, the file-s for this book were downloaded 106 times, the file-s went public at Sun Jun 16 2013.

Available formats:
Archive BitTorrent - Metadata - RAR -

Related Links:

Online Marketplaces

Find 10 Project Communication Management V 4 at online marketplaces:


35DTIC ADA557623: Dynamic Modeling For Project Management

By

project management

“DTIC ADA557623: Dynamic Modeling For Project Management” Metadata:

  • Title: ➤  DTIC ADA557623: Dynamic Modeling For Project Management
  • Author: ➤  
  • Language: English

“DTIC ADA557623: Dynamic Modeling For Project Management” Subjects and Themes:

Edition Identifiers:

Downloads Information:

The book is available for download in "texts" format, the size of the file-s is: 20.68 Mbs, the file-s for this book were downloaded 54 times, the file-s went public at Sat Sep 01 2018.

Available formats:
Abbyy GZ - Archive BitTorrent - DjVuTXT - Djvu XML - Item Tile - Metadata - OCR Page Index - OCR Search Text - Page Numbers JSON - Scandata - Single Page Processed JP2 ZIP - Text PDF - chOCR - hOCR -

Related Links:

Online Marketplaces

Find DTIC ADA557623: Dynamic Modeling For Project Management at online marketplaces:


36DTIC AD1016835: Improving Project Management Of Complex Or Major Systems

By

ACAT I Major Defense Acquisition Programs (MDAP), Major Automated Information Systems (MAIS)

“DTIC AD1016835: Improving Project Management Of Complex Or Major Systems” Metadata:

  • Title: ➤  DTIC AD1016835: Improving Project Management Of Complex Or Major Systems
  • Author: ➤  
  • Language: English

“DTIC AD1016835: Improving Project Management Of Complex Or Major Systems” Subjects and Themes:

Edition Identifiers:

Downloads Information:

The book is available for download in "texts" format, the size of the file-s is: 12.97 Mbs, the file-s for this book were downloaded 50 times, the file-s went public at Fri Dec 27 2019.

Available formats:
Abbyy GZ - Archive BitTorrent - DjVuTXT - Djvu XML - Item Tile - Metadata - OCR Page Index - OCR Search Text - Page Numbers JSON - Scandata - Single Page Processed JP2 ZIP - Text PDF - chOCR - hOCR -

Related Links:

Online Marketplaces

Find DTIC AD1016835: Improving Project Management Of Complex Or Major Systems at online marketplaces:


37Rothman V. Hasz Project Management And Design

This item represents a case in PACER, the U.S. Government's website for federal case data. If you wish to see the entire case, please consult PACER directly.

“Rothman V. Hasz Project Management And Design” Metadata:

  • Title: ➤  Rothman V. Hasz Project Management And Design
  • Language: English

Edition Identifiers:

Downloads Information:

The book is available for download in "texts" format, the size of the file-s is: 0.33 Mbs, the file-s went public at Thu Jun 26 2025.

Available formats:
Archive BitTorrent - Metadata - Text PDF -

Related Links:

Online Marketplaces

Find Rothman V. Hasz Project Management And Design at online marketplaces:


38Knowledge Management For Distributed Scientific Project Teams

By

Managing the information generated during the course of a scientific investigation is both a challenging and an essential task for NASA scientists. During an investigation, experimental records must be kept up-to-date and made accessible to all members of a scientific team. After an investigation, a thorough set of records is essential for historical documentation, reproducibility, and overall scientific credibility . These information-management requirements are particularly challenging when scientific work is carried out by large, geographically distributed teams, but even for small, collocated teams or individual scientists, knowledge management has become a time-consuming, frustrating exercise. Ames researchers are developing a suite of sophisticated information-sharing tools to address these complex knowledge-management issues.

“Knowledge Management For Distributed Scientific Project Teams” Metadata:

  • Title: ➤  Knowledge Management For Distributed Scientific Project Teams
  • Author:
  • Language: English

“Knowledge Management For Distributed Scientific Project Teams” Subjects and Themes:

Edition Identifiers:

Downloads Information:

The book is available for download in "texts" format, the size of the file-s is: 2.42 Mbs, the file-s for this book were downloaded 114 times, the file-s went public at Thu Jun 02 2011.

Available formats:
Abbyy GZ - Animated GIF - Archive BitTorrent - DjVuTXT - Djvu XML - Item Tile - Metadata - Scandata - Single Page Processed JP2 ZIP - Text PDF -

Related Links:

Online Marketplaces

Find Knowledge Management For Distributed Scientific Project Teams at online marketplaces:


39Communicating Project Management : The Integrated Vocabulary Of Project Management And Systems Engineering

By

Managing the information generated during the course of a scientific investigation is both a challenging and an essential task for NASA scientists. During an investigation, experimental records must be kept up-to-date and made accessible to all members of a scientific team. After an investigation, a thorough set of records is essential for historical documentation, reproducibility, and overall scientific credibility . These information-management requirements are particularly challenging when scientific work is carried out by large, geographically distributed teams, but even for small, collocated teams or individual scientists, knowledge management has become a time-consuming, frustrating exercise. Ames researchers are developing a suite of sophisticated information-sharing tools to address these complex knowledge-management issues.

“Communicating Project Management : The Integrated Vocabulary Of Project Management And Systems Engineering” Metadata:

  • Title: ➤  Communicating Project Management : The Integrated Vocabulary Of Project Management And Systems Engineering
  • Author:
  • Language: English

“Communicating Project Management : The Integrated Vocabulary Of Project Management And Systems Engineering” Subjects and Themes:

Edition Identifiers:

Downloads Information:

The book is available for download in "texts" format, the size of the file-s is: 683.33 Mbs, the file-s for this book were downloaded 38 times, the file-s went public at Thu Sep 24 2020.

Available formats:
ACS Encrypted EPUB - ACS Encrypted PDF - Abbyy GZ - Cloth Cover Detection Log - DjVuTXT - Djvu XML - Dublin Core - Item Tile - JPEG Thumb - JSON - LCP Encrypted EPUB - LCP Encrypted PDF - Log - MARC - MARC Binary - Metadata - OCR Page Index - OCR Search Text - PNG - Page Numbers JSON - Scandata - Single Page Original JP2 Tar - Single Page Processed JP2 ZIP - Text PDF - Title Page Detection Log - chOCR - hOCR -

Related Links:

Online Marketplaces

Find Communicating Project Management : The Integrated Vocabulary Of Project Management And Systems Engineering at online marketplaces:


40Business And Management Research : How To Complete Your Research Project Successfully

By

Managing the information generated during the course of a scientific investigation is both a challenging and an essential task for NASA scientists. During an investigation, experimental records must be kept up-to-date and made accessible to all members of a scientific team. After an investigation, a thorough set of records is essential for historical documentation, reproducibility, and overall scientific credibility . These information-management requirements are particularly challenging when scientific work is carried out by large, geographically distributed teams, but even for small, collocated teams or individual scientists, knowledge management has become a time-consuming, frustrating exercise. Ames researchers are developing a suite of sophisticated information-sharing tools to address these complex knowledge-management issues.

“Business And Management Research : How To Complete Your Research Project Successfully” Metadata:

  • Title: ➤  Business And Management Research : How To Complete Your Research Project Successfully
  • Author:
  • Language: English

“Business And Management Research : How To Complete Your Research Project Successfully” Subjects and Themes:

Edition Identifiers:

Downloads Information:

The book is available for download in "texts" format, the size of the file-s is: 821.45 Mbs, the file-s for this book were downloaded 22 times, the file-s went public at Wed Jul 15 2020.

Available formats:
ACS Encrypted EPUB - ACS Encrypted PDF - Abbyy GZ - Cloth Cover Detection Log - DjVuTXT - Djvu XML - Dublin Core - EPUB - Item Tile - JPEG Thumb - JSON - LCP Encrypted EPUB - LCP Encrypted PDF - Log - MARC - MARC Binary - Metadata - OCR Page Index - OCR Search Text - PNG - Page Numbers JSON - Scandata - Single Page Original JP2 Tar - Single Page Processed JP2 ZIP - Text PDF - Title Page Detection Log - chOCR - hOCR -

Related Links:

Online Marketplaces

Find Business And Management Research : How To Complete Your Research Project Successfully at online marketplaces:


41Utttf04 - Project Management, References And Office Space

come along and watch me build my own media production business

“Utttf04 - Project Management, References And Office Space” Metadata:

  • Title: ➤  Utttf04 - Project Management, References And Office Space

Edition Identifiers:

Downloads Information:

The book is available for download in "audio" format, the size of the file-s is: 13.97 Mbs, the file-s for this book were downloaded 2197 times, the file-s went public at Mon Feb 13 2006.

Available formats:
Archive BitTorrent - Item Tile - Metadata - Ogg Vorbis - PNG - Spectrogram - VBR MP3 -

Related Links:

Online Marketplaces

Find Utttf04 - Project Management, References And Office Space at online marketplaces:


42Risk Management In Project Organisations

By

come along and watch me build my own media production business

“Risk Management In Project Organisations” Metadata:

  • Title: ➤  Risk Management In Project Organisations
  • Author: ➤  
  • Language: English

“Risk Management In Project Organisations” Subjects and Themes:

Edition Identifiers:

Downloads Information:

The book is available for download in "texts" format, the size of the file-s is: 358.31 Mbs, the file-s for this book were downloaded 37 times, the file-s went public at Fri Jul 16 2021.

Available formats:
ACS Encrypted PDF - Cloth Cover Detection Log - DjVuTXT - Djvu XML - Dublin Core - Item Tile - JPEG Thumb - JSON - LCP Encrypted EPUB - LCP Encrypted PDF - Log - MARC - MARC Binary - Metadata - OCR Page Index - OCR Search Text - PNG - Page Numbers JSON - Scandata - Single Page Original JP2 Tar - Single Page Processed JP2 ZIP - Text PDF - Title Page Detection Log - chOCR - hOCR -

Related Links:

Online Marketplaces

Find Risk Management In Project Organisations at online marketplaces:


43Time-to-profit Project Management : A Primer For Project Managers In Commercial Product Development

By

Includes bibliographical references and index

“Time-to-profit Project Management : A Primer For Project Managers In Commercial Product Development” Metadata:

  • Title: ➤  Time-to-profit Project Management : A Primer For Project Managers In Commercial Product Development
  • Author:
  • Language: English

“Time-to-profit Project Management : A Primer For Project Managers In Commercial Product Development” Subjects and Themes:

Edition Identifiers:

Downloads Information:

The book is available for download in "texts" format, the size of the file-s is: 190.59 Mbs, the file-s for this book were downloaded 72 times, the file-s went public at Fri Jul 30 2010.

Available formats:
ACS Encrypted PDF - Abbyy GZ - Animated GIF - Cloth Cover Detection Log - DjVuTXT - Djvu XML - Dublin Core - Item Tile - JSON - LCP Encrypted EPUB - LCP Encrypted PDF - MARC - MARC Binary - MARC Source - Metadata - Metadata Log - OCLC xISBN JSON - OCR Page Index - OCR Search Text - Page Numbers JSON - Scandata - Single Page Original JP2 Tar - Single Page Processed JP2 ZIP - Text PDF - chOCR - hOCR -

Related Links:

Online Marketplaces

Find Time-to-profit Project Management : A Primer For Project Managers In Commercial Product Development at online marketplaces:


44K-12 Project Management Tips: Project Charter

By

Find more K-12 project management resources at https://www.sdcoe.net/administrative-services/technology/epmo

“K-12 Project Management Tips: Project Charter” Metadata:

  • Title: ➤  K-12 Project Management Tips: Project Charter
  • Author: ➤  
  • Language: English

“K-12 Project Management Tips: Project Charter” Subjects and Themes:

Edition Identifiers:

Downloads Information:

The book is available for download in "movies" format, the size of the file-s is: 29.40 Mbs, the file-s for this book were downloaded 28 times, the file-s went public at Sun Oct 16 2022.

Available formats:
Archive BitTorrent - Item Tile - MP3 - Metadata - PNG - Thumbnail - Web Video Text Tracks - h.264 - h.264 HD -

Related Links:

Online Marketplaces

Find K-12 Project Management Tips: Project Charter at online marketplaces:


45Project Management

Find more K-12 project management resources at https://www.sdcoe.net/administrative-services/technology/epmo

“Project Management” Metadata:

  • Title: Project Management
  • Language: English

“Project Management” Subjects and Themes:

Edition Identifiers:

Downloads Information:

The book is available for download in "texts" format, the size of the file-s is: 1306.16 Mbs, the file-s for this book were downloaded 15 times, the file-s went public at Sat Mar 18 2023.

Available formats:
ACS Encrypted PDF - Cloth Cover Detection Log - DjVuTXT - Djvu XML - Dublin Core - Extra Metadata JSON - Item Tile - JPEG Thumb - JSON - LCP Encrypted EPUB - LCP Encrypted PDF - Log - MARC - MARC Binary - Metadata - Metadata Log - OCR Page Index - OCR Search Text - PNG - Page Numbers JSON - RePublisher Final Processing Log - RePublisher Initial Processing Log - Scandata - Single Page Original JP2 Tar - Single Page Processed JP2 ZIP - Text PDF - Title Page Detection Log - chOCR - hOCR -

Related Links:

Online Marketplaces

Find Project Management at online marketplaces:


46Scoping Process Update Stillwater Mine Proposed Tailings Impoundment Project And Waste Management Plan

By

Find more K-12 project management resources at https://www.sdcoe.net/administrative-services/technology/epmo

“Scoping Process Update Stillwater Mine Proposed Tailings Impoundment Project And Waste Management Plan” Metadata:

  • Title: ➤  Scoping Process Update Stillwater Mine Proposed Tailings Impoundment Project And Waste Management Plan
  • Authors: ➤  
  • Language: English

“Scoping Process Update Stillwater Mine Proposed Tailings Impoundment Project And Waste Management Plan” Subjects and Themes:

Edition Identifiers:

Downloads Information:

The book is available for download in "texts" format, the size of the file-s is: 27.83 Mbs, the file-s for this book were downloaded 258 times, the file-s went public at Tue Aug 19 2014.

Available formats:
Abbyy GZ - Animated GIF - Archive BitTorrent - Cloth Cover Detection Log - DjVu - DjVuTXT - Djvu XML - Dublin Core - Item Tile - MARC - MARC Binary - MARC Source - Metadata - OCR Page Index - OCR Search Text - Page Numbers JSON - Scandata - Single Page Original JP2 Tar - Single Page Processed JP2 ZIP - Text PDF - Title Page Detection Log - chOCR - hOCR -

Related Links:

Online Marketplaces

Find Scoping Process Update Stillwater Mine Proposed Tailings Impoundment Project And Waste Management Plan at online marketplaces:


47Why Project Management Matters For K-12 IT - A Message From Dr. Gothold

By

SDCOE Superintendent Dr. Paul Gothold reminds us that IT teams are "hidden heroes" and that project management helps us save dollars and support students and teachers.

“Why Project Management Matters For K-12 IT - A Message From Dr. Gothold” Metadata:

  • Title: ➤  Why Project Management Matters For K-12 IT - A Message From Dr. Gothold
  • Author: ➤  
  • Language: English

“Why Project Management Matters For K-12 IT - A Message From Dr. Gothold” Subjects and Themes:

Edition Identifiers:

Downloads Information:

The book is available for download in "movies" format, the size of the file-s is: 17.99 Mbs, the file-s for this book were downloaded 33 times, the file-s went public at Wed Jun 22 2022.

Available formats:
Archive BitTorrent - Item Tile - MP3 - Metadata - PNG - Thumbnail - Web Video Text Tracks - h.264 - h.264 HD -

Related Links:

Online Marketplaces

Find Why Project Management Matters For K-12 IT - A Message From Dr. Gothold at online marketplaces:


48CIA Reading Room Cia-rdp57-00042a000100160002-0: MANAGEMENT STAFF PROJECT NO. 4-100, 'REVIEW AND SIMPLIFICATION OF THE ORR TIME DISTRIBUTION SYSTEM, ECONOMIC AREA'

By

Sanitized - Approved For Release : CIA-RDP57-00042AO00100160002-0 15 April 195h T'I; Assistant Director, ?iffice of Research and Reports S?TT JTCT: ' anagement staff Project No. )t=l" O, "Review and Simplification of the ORR Time Distribution c?istem, Economic Area!" 1. PROBLEM: a, To review the present ORR Time Distribution system for the Economic Area, utilizing ORR studies, recommendations and convents made on this system now ,eing employed; and develop a Project Control System which will provide a uniform and defined flow of time and progress in~'ormation from appropriate levels in the organization to the Project Control staff, b. The system developed should provide for the maintenance of project workload records at the point in the organization where then records can best serve to support supervisory decisions, ~.a~~t'C c, The information gathered through the system developed should provide experience data regarding times expended on projects,, programs, consumers, etc., for use in future recearch programming, t,udgeting ane planning, and assessment of research time provided in support of major requesters, P. A"ITMPTIM;S: a. The use of the term "Project" in this study denotes a unit of work- load that will be assigned a control nurdl?er for purposes of accouni.a-- bility of work time expended in accomplishing the workload and ac- countability of work orogress information required for control pur- poses. These units of controlled workload may in themselves be comniete major orojects, segments of a major project, consumer requests, program work assignments, etc. b. The present ORR regulatory directives regarding the aaoroval of projects have not been considered in the solution of this problem in that the problem is the de-elopment of a system of time and progress control of major orojects and workload after they have teen initiated not r)rior to their initiation, FACTS ?=E!RTN,'G ON THE PRII LEM: a, The divisions of ORR under the Chief, Economic Research have teen pre- paring and submitting reports of `.Yme Distribution by analysts since 5 January 1953, These reports individually prepared by each analyst are summarized to show ag:-regate distribution of analyst time by project number and categories of time oxpenditure. Data gleened from these reports is intended to provide a sut_stantive record on which gtk`AfRPR@I?e !-IIflWogeetsos Sai ILI WOMM Sanitized - Approved For Release : C A-RDP57-00042A000100160002-0 regarding demands on analyst's time thy. various categories of tasks; and to improve the collective abil.i,t;r to estimate t- me requirements when projects ar(I proposed. b. A study of the O1R Time Distribution S;rtem made as of 25 November 1953 by ORR personnel citoA -,any deficiencies in this system. A few of these deficiencies are cited here in that the recognition of their existence justifies the need for this revit and recommended corrective action., (1) The present time distribution system, as provided under ORR ?iotices R52 -6R, R67-53s and Rh3.53 does not provide all the kinds of infor- mation now deemed desirable. (2) The use of man-hours by the Project Control `,taff to determine the amount of completion of a given project is misleading and Lurden- some. () The time distribution system varies in local use and interpretation with the nature of the division research as well as individuals. (t) The value of the present time distribution system has resulted mainly in the compilation of statistical'experience information which can be employed to assist in the determination of estimated completion dates for future projt,,cts when planning divisional research programs, This information to be reaaily used has to be reworked and analyzed in terms of the variables and unknowns presently inherent in the system. (5) Present-reporting has been found to be lacking in accuracy and result in statistical inaccuracies. The actual existent errors cannot be readily determined. (6) The utilization of resultant reports of the time distribution system has been sporadic and has not served all the purposes for which it was designed, (7) Present renmrting requirements are time consuming and the value of the results is questionable in light of the cost in terms of time and effort, c. Economic Area division and branch chiefs have from time to time in the past expressed comments and suggestions regarding the present Time Distribution System, The consensus is that time reports should be continued and should be used as an aid for more effective planning and control. A review and general discussion of some of these comments is offered as supplementary data (ANNEX 2) for use in on-site develop- ment and installation introduction material. a. As previously cited the present Time Distribution System of monthly reports have been in effect for the past fifteen months. T.-see reports have been supplemented with man-hour estimates required for the completion of each project together with monthly statements of Sanitized - Approved For Release~2CIA-RDP57-00042AO00100160002-0 Sanitized - Approved For Release : CIA-RDP57-00042AO00100160002-0 the number of man-hours spent on a given project. This information is supplied to the Project Control Staff for their use in over-all control requirements. A project control chart. is also maintained here which reflects th se estimated project man-hours6y percentage of time completion- ,

“CIA Reading Room Cia-rdp57-00042a000100160002-0: MANAGEMENT STAFF PROJECT NO. 4-100, 'REVIEW AND SIMPLIFICATION OF THE ORR TIME DISTRIBUTION SYSTEM, ECONOMIC AREA'” Metadata:

  • Title: ➤  CIA Reading Room Cia-rdp57-00042a000100160002-0: MANAGEMENT STAFF PROJECT NO. 4-100, 'REVIEW AND SIMPLIFICATION OF THE ORR TIME DISTRIBUTION SYSTEM, ECONOMIC AREA'
  • Author:
  • Language: English

Edition Identifiers:

Downloads Information:

The book is available for download in "texts" format, the size of the file-s is: 5.52 Mbs, the file-s for this book were downloaded 21 times, the file-s went public at Fri Jun 30 2023.

Available formats:
Additional Text PDF - Archive BitTorrent - DjVuTXT - Djvu XML - Image Container PDF - Image-Only PDF Metadata JSON - Item Tile - Metadata - OCR Page Index - OCR Search Text - Page Numbers JSON - Scandata - Single Page Processed JP2 ZIP - chOCR - hOCR -

Related Links:

Online Marketplaces

Find CIA Reading Room Cia-rdp57-00042a000100160002-0: MANAGEMENT STAFF PROJECT NO. 4-100, 'REVIEW AND SIMPLIFICATION OF THE ORR TIME DISTRIBUTION SYSTEM, ECONOMIC AREA' at online marketplaces:


49Models & Methods For Project Selection : Concepts From Management Science, Finance, And Information Technology

By

Sanitized - Approved For Release : CIA-RDP57-00042AO00100160002-0 15 April 195h T'I; Assistant Director, ?iffice of Research and Reports S?TT JTCT: ' anagement staff Project No. )t=l" O, "Review and Simplification of the ORR Time Distribution c?istem, Economic Area!" 1. PROBLEM: a, To review the present ORR Time Distribution system for the Economic Area, utilizing ORR studies, recommendations and convents made on this system now ,eing employed; and develop a Project Control System which will provide a uniform and defined flow of time and progress in~'ormation from appropriate levels in the organization to the Project Control staff, b. The system developed should provide for the maintenance of project workload records at the point in the organization where then records can best serve to support supervisory decisions, ~.a~~t'C c, The information gathered through the system developed should provide experience data regarding times expended on projects,, programs, consumers, etc., for use in future recearch programming, t,udgeting ane planning, and assessment of research time provided in support of major requesters, P. A"ITMPTIM;S: a. The use of the term "Project" in this study denotes a unit of work- load that will be assigned a control nurdl?er for purposes of accouni.a-- bility of work time expended in accomplishing the workload and ac- countability of work orogress information required for control pur- poses. These units of controlled workload may in themselves be comniete major orojects, segments of a major project, consumer requests, program work assignments, etc. b. The present ORR regulatory directives regarding the aaoroval of projects have not been considered in the solution of this problem in that the problem is the de-elopment of a system of time and progress control of major orojects and workload after they have teen initiated not r)rior to their initiation, FACTS ?=E!RTN,'G ON THE PRII LEM: a, The divisions of ORR under the Chief, Economic Research have teen pre- paring and submitting reports of `.Yme Distribution by analysts since 5 January 1953, These reports individually prepared by each analyst are summarized to show ag:-regate distribution of analyst time by project number and categories of time oxpenditure. Data gleened from these reports is intended to provide a sut_stantive record on which gtk`AfRPR@I?e !-IIflWogeetsos Sai ILI WOMM Sanitized - Approved For Release : C A-RDP57-00042A000100160002-0 regarding demands on analyst's time thy. various categories of tasks; and to improve the collective abil.i,t;r to estimate t- me requirements when projects ar(I proposed. b. A study of the O1R Time Distribution S;rtem made as of 25 November 1953 by ORR personnel citoA -,any deficiencies in this system. A few of these deficiencies are cited here in that the recognition of their existence justifies the need for this revit and recommended corrective action., (1) The present time distribution system, as provided under ORR ?iotices R52 -6R, R67-53s and Rh3.53 does not provide all the kinds of infor- mation now deemed desirable. (2) The use of man-hours by the Project Control `,taff to determine the amount of completion of a given project is misleading and Lurden- some. () The time distribution system varies in local use and interpretation with the nature of the division research as well as individuals. (t) The value of the present time distribution system has resulted mainly in the compilation of statistical'experience information which can be employed to assist in the determination of estimated completion dates for future projt,,cts when planning divisional research programs, This information to be reaaily used has to be reworked and analyzed in terms of the variables and unknowns presently inherent in the system. (5) Present-reporting has been found to be lacking in accuracy and result in statistical inaccuracies. The actual existent errors cannot be readily determined. (6) The utilization of resultant reports of the time distribution system has been sporadic and has not served all the purposes for which it was designed, (7) Present renmrting requirements are time consuming and the value of the results is questionable in light of the cost in terms of time and effort, c. Economic Area division and branch chiefs have from time to time in the past expressed comments and suggestions regarding the present Time Distribution System, The consensus is that time reports should be continued and should be used as an aid for more effective planning and control. A review and general discussion of some of these comments is offered as supplementary data (ANNEX 2) for use in on-site develop- ment and installation introduction material. a. As previously cited the present Time Distribution System of monthly reports have been in effect for the past fifteen months. T.-see reports have been supplemented with man-hour estimates required for the completion of each project together with monthly statements of Sanitized - Approved For Release~2CIA-RDP57-00042AO00100160002-0 Sanitized - Approved For Release : CIA-RDP57-00042AO00100160002-0 the number of man-hours spent on a given project. This information is supplied to the Project Control Staff for their use in over-all control requirements. A project control chart. is also maintained here which reflects th se estimated project man-hours6y percentage of time completion- ,

“Models & Methods For Project Selection : Concepts From Management Science, Finance, And Information Technology” Metadata:

  • Title: ➤  Models & Methods For Project Selection : Concepts From Management Science, Finance, And Information Technology
  • Author:
  • Language: English

Edition Identifiers:

Downloads Information:

The book is available for download in "texts" format, the size of the file-s is: 420.47 Mbs, the file-s for this book were downloaded 26 times, the file-s went public at Mon Sep 13 2021.

Available formats:
ACS Encrypted PDF - Cloth Cover Detection Log - DjVuTXT - Djvu XML - Dublin Core - Item Tile - JPEG Thumb - JSON - LCP Encrypted EPUB - LCP Encrypted PDF - Log - MARC - MARC Binary - Metadata - OCR Page Index - OCR Search Text - PNG - Page Numbers JSON - Scandata - Single Page Original JP2 Tar - Single Page Processed JP2 ZIP - Text PDF - Title Page Detection Log - chOCR - hOCR -

Related Links:

Online Marketplaces

Find Models & Methods For Project Selection : Concepts From Management Science, Finance, And Information Technology at online marketplaces:


502896035_Project Management: Complete Idiot's Guide-5403684

Sanitized - Approved For Release : CIA-RDP57-00042AO00100160002-0 15 April 195h T'I; Assistant Director, ?iffice of Research and Reports S?TT JTCT: ' anagement staff Project No. )t=l" O, "Review and Simplification of the ORR Time Distribution c?istem, Economic Area!" 1. PROBLEM: a, To review the present ORR Time Distribution system for the Economic Area, utilizing ORR studies, recommendations and convents made on this system now ,eing employed; and develop a Project Control System which will provide a uniform and defined flow of time and progress in~'ormation from appropriate levels in the organization to the Project Control staff, b. The system developed should provide for the maintenance of project workload records at the point in the organization where then records can best serve to support supervisory decisions, ~.a~~t'C c, The information gathered through the system developed should provide experience data regarding times expended on projects,, programs, consumers, etc., for use in future recearch programming, t,udgeting ane planning, and assessment of research time provided in support of major requesters, P. A"ITMPTIM;S: a. The use of the term "Project" in this study denotes a unit of work- load that will be assigned a control nurdl?er for purposes of accouni.a-- bility of work time expended in accomplishing the workload and ac- countability of work orogress information required for control pur- poses. These units of controlled workload may in themselves be comniete major orojects, segments of a major project, consumer requests, program work assignments, etc. b. The present ORR regulatory directives regarding the aaoroval of projects have not been considered in the solution of this problem in that the problem is the de-elopment of a system of time and progress control of major orojects and workload after they have teen initiated not r)rior to their initiation, FACTS ?=E!RTN,'G ON THE PRII LEM: a, The divisions of ORR under the Chief, Economic Research have teen pre- paring and submitting reports of `.Yme Distribution by analysts since 5 January 1953, These reports individually prepared by each analyst are summarized to show ag:-regate distribution of analyst time by project number and categories of time oxpenditure. Data gleened from these reports is intended to provide a sut_stantive record on which gtk`AfRPR@I?e !-IIflWogeetsos Sai ILI WOMM Sanitized - Approved For Release : C A-RDP57-00042A000100160002-0 regarding demands on analyst's time thy. various categories of tasks; and to improve the collective abil.i,t;r to estimate t- me requirements when projects ar(I proposed. b. A study of the O1R Time Distribution S;rtem made as of 25 November 1953 by ORR personnel citoA -,any deficiencies in this system. A few of these deficiencies are cited here in that the recognition of their existence justifies the need for this revit and recommended corrective action., (1) The present time distribution system, as provided under ORR ?iotices R52 -6R, R67-53s and Rh3.53 does not provide all the kinds of infor- mation now deemed desirable. (2) The use of man-hours by the Project Control `,taff to determine the amount of completion of a given project is misleading and Lurden- some. () The time distribution system varies in local use and interpretation with the nature of the division research as well as individuals. (t) The value of the present time distribution system has resulted mainly in the compilation of statistical'experience information which can be employed to assist in the determination of estimated completion dates for future projt,,cts when planning divisional research programs, This information to be reaaily used has to be reworked and analyzed in terms of the variables and unknowns presently inherent in the system. (5) Present-reporting has been found to be lacking in accuracy and result in statistical inaccuracies. The actual existent errors cannot be readily determined. (6) The utilization of resultant reports of the time distribution system has been sporadic and has not served all the purposes for which it was designed, (7) Present renmrting requirements are time consuming and the value of the results is questionable in light of the cost in terms of time and effort, c. Economic Area division and branch chiefs have from time to time in the past expressed comments and suggestions regarding the present Time Distribution System, The consensus is that time reports should be continued and should be used as an aid for more effective planning and control. A review and general discussion of some of these comments is offered as supplementary data (ANNEX 2) for use in on-site develop- ment and installation introduction material. a. As previously cited the present Time Distribution System of monthly reports have been in effect for the past fifteen months. T.-see reports have been supplemented with man-hour estimates required for the completion of each project together with monthly statements of Sanitized - Approved For Release~2CIA-RDP57-00042AO00100160002-0 Sanitized - Approved For Release : CIA-RDP57-00042AO00100160002-0 the number of man-hours spent on a given project. This information is supplied to the Project Control Staff for their use in over-all control requirements. A project control chart. is also maintained here which reflects th se estimated project man-hours6y percentage of time completion- ,

“2896035_Project Management: Complete Idiot's Guide-5403684” Metadata:

  • Title: ➤  2896035_Project Management: Complete Idiot's Guide-5403684

Edition Identifiers:

Downloads Information:

The book is available for download in "movies" format, the size of the file-s is: 23.98 Mbs, the file-s for this book were downloaded 19 times, the file-s went public at Thu Aug 08 2019.

Available formats:
Archive BitTorrent - Flash Video - Item Tile - Metadata - Ogg Video - Thumbnail - h.264 -

Related Links:

Online Marketplaces

Find 2896035_Project Management: Complete Idiot's Guide-5403684 at online marketplaces:


Source: LibriVox

LibriVox Search Results

Available audio books for downloads from LibriVox

1Egoist

By

Book's cover

<em>The Egoist</em> is a tragi-comical novel by George Meredith published in 1879. The novel recounts the story of self-absorbed Sir Willoughby Patterne and his attempts at marriage; jilted by his first bride-to-be, he vacillates between the sentimental Laetitia Dale and the strong-willed Clara Middleton. More importantly, the novel follows Clara's attempts to escape from her engagement to Sir Willoughby, who desires women to serve as a mirror for him and consequently cannot understand why she would not want to marry him. Thus, <em>The Egoist</em> dramatizes the difficulty contingent upon being a woman in Victorian society, when women's bodies and minds are trafficked between fathers and husbands to cement male bonds. (Summary from Wikipedia)

“Egoist” Metadata:

  • Title: Egoist
  • Author:
  • Language: English
  • Publish Date:

Edition Specifications:

  • Format: Audio
  • Number of Sections: 51
  • Total Time: 22:17:56

Edition Identifiers:

Links and information:

Online Access

Download the Audio Book:

  • File Name: egoist_0909_librivox
  • File Format: zip
  • Total Time: 22:17:56
  • Download Link: Download link

Online Marketplaces

Find Egoist at online marketplaces:


2Shaving of Shagpat

By

Book's cover

The novel is a humorous oriental romance and allegory written in the style of the Arabian Nights. Like its model, it includes a number of stories within the story, along with poetic asides. (Summary by Wikipedia.) <br/><br/> “The variety of scenes and images, the untiring evolution of plot, the kaleidoscopic shifting of harmonious colours, all these seem of the very essence of Arabia, and to coil directly from some bottle of a genie. Ah! what a bottle!” -Edmund Gosse in <a href="http://librivox.org/gossip-in-a-library-by-edmund-gosse/">Gossip in a Library</a>

“Shaving of Shagpat” Metadata:

  • Title: Shaving of Shagpat
  • Author:
  • Language: English
  • Publish Date:

Edition Specifications:

  • Format: Audio
  • Number of Sections: 31
  • Total Time: 9:04:22

Edition Identifiers:

Links and information:

Online Access

Download the Audio Book:

  • File Name: shaving_shagpat_1105_librivox
  • File Format: zip
  • Total Time: 9:04:22
  • Download Link: Download link

Online Marketplaces

Find Shaving of Shagpat at online marketplaces:


3Master-Knot of Human Fate

By

Book's cover

A tale of two people, and their search for answers to unknown questions. Adam and Robin find themselves inexplicably alone after an apparent natural cataclysm, and are compelled to learn how to survive, how to endure, but most importantly to themselves, how to enjoy, understand their new roles in life, and understand each other. (Introduction by Roger Melin)

“Master-Knot of Human Fate” Metadata:

  • Title: Master-Knot of Human Fate
  • Author:
  • Language: English
  • Publish Date:

Edition Specifications:

  • Format: Audio
  • Number of Sections: 22
  • Total Time: 4:19:41

Edition Identifiers:

Links and information:

  • LibriVox Link:
  • Text Source: - Download text file/s.
  • Number of Sections: 22 sections

Online Access

Download the Audio Book:

  • File Name: masterknot_fate_rm_librivox
  • File Format: zip
  • Total Time: 4:19:41
  • Download Link: Download link

Online Marketplaces

Find Master-Knot of Human Fate at online marketplaces:


4Diana of the Crossways

By

Book's cover

Inspired by the real life story of Caroline Norton, a friend of the author's, this book tells about a lively woman who is trapped in a miserable marriage. Yet Diana is not one to give up in her quest for love, happiness and fulfillment. - Summary by Stav Nisser

“Diana of the Crossways” Metadata:

  • Title: Diana of the Crossways
  • Author:
  • Language: English
  • Publish Date:

Edition Specifications:

  • Format: Audio
  • Number of Sections: 43
  • Total Time: 16:45:16

Edition Identifiers:

Links and information:

Online Access

Download the Audio Book:

  • File Name: dianaofthecrossways_1706_librivox
  • File Format: zip
  • Total Time: 16:45:16
  • Download Link: Download link

Online Marketplaces

Find Diana of the Crossways at online marketplaces:


5Reading of Life, with Other Poems

By

Book's cover

This is a volume of poetry by George Meredith. The first four poems are the cycle A Circle of Life, the rest of the poems are miscellaneous collected poems. - Summary by Carolin

“Reading of Life, with Other Poems” Metadata:

  • Title: ➤  Reading of Life, with Other Poems
  • Author:
  • Language: English
  • Publish Date:

Edition Specifications:

  • Format: Audio
  • Number of Sections: 25
  • Total Time: 01:49:32

Edition Identifiers:

Links and information:

  • LibriVox Link:
  • Text Source: - Download text file/s.
  • Number of Sections: 25 sections

Online Access

Download the Audio Book:

  • File Name: a_reading_of_life_1808_librivox
  • File Format: zip
  • Total Time: 01:49:32
  • Download Link: Download link

Online Marketplaces

Find Reading of Life, with Other Poems at online marketplaces:


6Ordeal of Richard Feverel

By

Book's cover

After his wife's desertion, Sir Austin wants to bring up his son according to a strict educational system governing every aspect of his life. However Richard has to make his own mistakes, fall in love, and generally live his own life. This book tells about the clashes between Richard's wish to govern his own life to his father's constant interference. This book was very influential. The leading libraries of the day considered it too frank and sexually explicit and refused to buy it. Later authors including E. M. Forster, Oscar Wilde and Virginia Woolf admired and respected it. - Summary by Stav Nisser and Wikipedia

“Ordeal of Richard Feverel” Metadata:

  • Title: Ordeal of Richard Feverel
  • Author:
  • Language: English
  • Publish Date:

Edition Specifications:

  • Format: Audio
  • Number of Sections: 45
  • Total Time: 18:42:15

Edition Identifiers:

Links and information:

Online Access

Download the Audio Book:

  • File Name: theordealofrichardfeverel_1912_librivox
  • File Format: zip
  • Total Time: 18:42:15
  • Download Link: Download link

Online Marketplaces

Find Ordeal of Richard Feverel at online marketplaces:


7Lucifer in Starlight

By

Book's cover

LibriVox volunteers bring you 14 recordings of Lucifer in Starlight, by George Meredith.<br> This was the Weekly Poetry project for July 4th, 2021. <br> ------<br> George Meredith OM was an English novelist and poet of the Victorian era. At first, his focus was poetry, influenced by John Keats among others, but he gradually established a reputation as a novelist. His style, in both poetry and prose, was noted for its syntactic complexity; Oscar Wilde likened it to "chaos illumined by brilliant flashes of lightning". (Wikipedia)

“Lucifer in Starlight” Metadata:

  • Title: Lucifer in Starlight
  • Author:
  • Language: English
  • Publish Date:

Edition Specifications:

  • Format: Audio
  • Number of Sections: 14
  • Total Time: 00:17:30

Edition Identifiers:

Links and information:

  • LibriVox Link:
  • Text Source: - Download text file/s.
  • Number of Sections: 14 sections

Online Access

Download the Audio Book:

  • File Name: lucifer_in_starlight_2107,poem_librivox
  • File Format: zip
  • Total Time: 00:17:30
  • Download Link: Download link

Online Marketplaces

Find Lucifer in Starlight at online marketplaces:


8Modern Love

By

This is a 50-poem sequence of 16-line sonnets, divided into 10 sections. It has been called "a novelette in sonnet form". The author, George Meredith, pours his heart out in raw anguish, pain, and heartbreak, as he recalls the moments, and sometimes intimate memories of his wife who deserted him for another lover. (Summary by Laur)

“Modern Love” Metadata:

  • Title: Modern Love
  • Author:
  • Language: English
  • Publish Date:

Edition Specifications:

  • Format: Audio
  • Number of Sections: 10
  • Total Time: 00:57:50

Edition Identifiers:

Links and information:

Online Access

Download the Audio Book:

  • File Name: modern_love_2211_librivox
  • File Format: zip
  • Total Time: 00:57:50
  • Download Link: Download link

Online Marketplaces

Find Modern Love at online marketplaces:


Buy “Project Management” online:

Shop for “Project Management” on popular online marketplaces.