Downloads & Free Reading Options - Results

Dtic Ada385871%3a Confirmation Sampling And Analysis Plan For Building 406%2c Offutt Air Force Base%2c Nebraska by Defense Technical Information Center

Read "Dtic Ada385871%3a Confirmation Sampling And Analysis Plan For Building 406%2c Offutt Air Force Base%2c Nebraska" by Defense Technical Information Center through these free online access and download options.

Search for Downloads

Search by Title or Author

Books Results

Source: The Internet Archive

The internet Archive Search Results

Available books for downloads and borrow from The internet Archive

1DTIC ADA385871: Confirmation Sampling And Analysis Plan For Building 406, Offutt Air Force Base, Nebraska

By

This confirmation sampling and analysis plan (SAP) has been prepared by Parsons Engineering Science, Inc. (Parsons ES), FORMERLY Engineering-Science, Inc. (ES), for submittal to the US Air Force Center for Environmental Excellence (AFCEE), Brooks Air Force Base (AFB), Texas, and 55 Civil Engineering Squadron/Environmental Division (CES/CEVR), Offutt AFB, Nebraska. The SAP is intended to guide confirmation soil sampling at Building 406 at Offutt AFB, Nebraska. Building 406 is the location of a release of jet propulsion grade 4 (JP-4) jet fuel from a former underground storage tank (UST) system. Since 1992, Offutt AFB has participated in two AFCEE-sponsored bioventing projects; currently, the Extended Bioventing Project, and formerly, the Bioventing Pilot Test Initiative. The Bioventing Pilot Test Initiative included conducting more than 135 in situ bioventing pilot tests at 48 Air Force installations nationwide. These tests were designed to collect data on the effectiveness of bioventing for the remediation of soil contaminated with fuel hydrocarbons (e.g., W-4 jet fuel, diesel fuel, gasoline, or heating oil). As part of this project, bioventing pilot tests were conducted at the Low-Point Drain site (Building 528), Building 30, the Petroleum, Oils, and Lubricants site, and Building 406 at Offutt AFB. The purpose of the pilot test at Building 406 was to evaluate the effectiveness of bioventing in remediating unsaturated soils contaminated with petroleum hydrocarbons that resulted from JP-4 released from the former USTs. The underground storage tanks (USTs) were removed in October 1993 (Terracon Environmental, Inc., 1993). Based on the results of the extended bioventing test, in situ bioventing appears to have reduced petroleum hydrocarbon contamination in site soils sufficiently to meet Nebraska Department of Environmental Quality (NDEQ) requirements for closure of the site.

“DTIC ADA385871: Confirmation Sampling And Analysis Plan For Building 406, Offutt Air Force Base, Nebraska” Metadata:

  • Title: ➤  DTIC ADA385871: Confirmation Sampling And Analysis Plan For Building 406, Offutt Air Force Base, Nebraska
  • Author: ➤  
  • Language: English

“DTIC ADA385871: Confirmation Sampling And Analysis Plan For Building 406, Offutt Air Force Base, Nebraska” Subjects and Themes:

Edition Identifiers:

Downloads Information:

The book is available for download in "texts" format, the size of the file-s is: 48.33 Mbs, the file-s for this book were downloaded 48 times, the file-s went public at Mon Apr 30 2018.

Available formats:
Abbyy GZ - Additional Text PDF - Archive BitTorrent - DjVuTXT - Djvu XML - Image Container PDF - JPEG Thumb - Metadata - OCR Page Index - OCR Search Text - Page Numbers JSON - Scandata - Single Page Processed JP2 ZIP - chOCR - hOCR -

Related Links:

Online Marketplaces

Find DTIC ADA385871: Confirmation Sampling And Analysis Plan For Building 406, Offutt Air Force Base, Nebraska at online marketplaces:


Buy “Dtic Ada385871%3a Confirmation Sampling And Analysis Plan For Building 406%2c Offutt Air Force Base%2c Nebraska” online:

Shop for “Dtic Ada385871%3a Confirmation Sampling And Analysis Plan For Building 406%2c Offutt Air Force Base%2c Nebraska” on popular online marketplaces.